Master systems integration for building operations.
Your controls contractor can deliver a working system while your operators still cannot see its alarms. When several vendors share that connection, SLA coordinates who sends each point, who receives it and how the team proves the alarm reaches the right screen.
DEFINE THE INTEGRATION SCOPE
Integration scope and vendor responsibilities.
MSI is the delivery work that coordinates separate systems and vendors around the owner’s operating needs. SLA helps define each interface, resolve gaps between scopes, map the required information and verify its path to the receiving system.
Coordinate providers: establish which party supplies each signal, interface, configuration and supporting record.
Define exchanges: agree source and destination points, communication interfaces, command boundaries, units, scaling and update requirements.
Plan alarms and trends: identify the events, priorities, timestamps, trend intervals and retention needed for the owner’s tasks and platform.
Verify and hand over: check field-to-screen information, record exceptions and retests, and transfer the agreed configurations, backups and operating documentation.
HOW MSI CONNECTS THE WORK
Define what must be demonstrated.
Connect the owner’s requirements to interfaces, readiness and acceptance evidence across the systems within scope.
Keep local control responsibilities clear.
Agree which system commands, protects and reports. MSI coordinates interfaces; it does not remove local control or protective functions.
Give performance information context.
Carry asset identity, units, timestamps and quality to the owner’s view so trends support useful investigation.
Put the interfaces into the documents.
Define architecture, naming, exchange requirements, responsibilities and verification. Division 25 documents the agreed integrated-automation scope.
Illustrative relationships. Scope and acceptance evidence are agreed for each project. No connection to live equipment.
OWNER STANDARDS & SPECIFICATIONS
Division 25 defines the integration requirements.
Division 25 is the Integrated Automation division in CSI MasterFormat, used to organize project specifications. The project’s adopted specifications establish the required work; MSI coordinates implementation of that agreed scope. The owner, designers and delivery team must align those requirements with the other project divisions.
What the documents need to settle
System architecture, vendor boundaries, required exchanges and responsibility for each interface.
Equipment and point naming, metadata, mapping rules, alarms, trends and the records needed at acceptance.
For projects using GSA or another owner’s standards, confirm the applicable documents and revisions. One institution’s naming or access rules do not automatically apply to another facility.
Know what connects, understand the operating information and see what has been verified. SLA defines the records, screens and checks around your project’s needs.
01
Defined interfaces
Know what connects and who is responsible.
You receive
Connection diagrams and an interface register identifying the systems, required information exchanges, command boundaries and responsible parties.
Your team uses them to
Coordinate vendors, plan handoffs and trace issues to the right system or responsible team.
02
A consistent data model
Know what every point means.
You receive
An equipment and point register mapping source tags to agreed names, locations, units and relationships in the owner’s SCADA, BAS or reporting environment.
Your team uses it to
Find the right equipment, interpret alarms and compare trends while preserving the meaning of each point.
03
Verified connections
See what was checked and what passed.
You receive
Field-to-screen check records covering identity, units, scaling, timestamps, update behavior and data quality, with unresolved items identified.
Your team uses them to
Review acceptance evidence, assign follow-up actions and understand the limits of the information used for operating decisions.
Operating handoff: the agreed package also identifies alarm and trend settings, access responsibilities, configuration versions, recoverable backups and unresolved items. Screen development, licensed software, backup access and acceptance checks are defined for the systems within scope.
THE DATA MODEL IN PRACTICE
Which equipment? What does the value mean?
A SCADA screen brings equipment, operating status and point values into one view. The data model behind it identifies what each point means and where it comes from.
SCADA / Plant operating viewIllustrative example
“CHW temperature” is not enough.
Your operator needs to know which equipment, which condition, whether the reading is accurate and whether it is current.
Define the pointPlant → Chiller 01 → chilled-water supply temperature. Distinguish supply from return.
Preserve its meaningMap the source tag to that equipment and point, with the correct units, scaling, timestamp and quality status.
Verify the displayed resultCompare the installed measurement with an appropriate reference where required, then trace its identity, units and scaling through the interface to the operating screen. Record exceptions and their resolution.
For the owner’s team: locate the equipment, investigate an alarm and compare operating trends with a clear understanding of the data.
ONE POINT, SEVERAL DIFFERENT REQUIREMENTS
A name, a model and a protocol do different jobs.
Where the owner specifies Project Haystack or Brick, agree the required equipment, point and relationship model and validate its mappings. A label or a successful connection alone does not establish correct meaning.
Naming
The agreed identifier lets people and systems recognize the same asset or point.
Semantic model
Metadata describes what the point represents and how it relates to equipment, spaces and other points.
Protocol and mapping
The communication interface carries values. Mapping connects the source addresses, units and scaling to the destination.
Controls
Local logic operates equipment within its assigned authority. MSI does not bypass control or protective functions.
Dashboard
An operating view presents information for a task. Its usefulness depends on the underlying model and verified data.
Keep the responsibilities clear.MSI coordinates the interfaces. Cybersecurity, network access, equipment programming and acceptance remain with the parties assigned in the agreed scope.
VERIFICATION & HANDOFF
Carry the evidence into operation.
Keep interface checks, point meaning and configuration records connected to the information your facilities team uses.