Page 1 · YOUR SYSTEMS. WORKING TOGETHER.
Read page 1 text
STREAMLINE AUTOMATION
WHY SLA / YOUR NEXT PROJECT DECISION
STREAMLINE AUTOMATION / Cx · CONTROLS · MSI · ENERGY · INDUSTRIAL AUTOMATION · QA/QC 01 / 12
THE CASE FOR BRINGING SLA INTO YOUR PROJECT YOUR SYSTEMS. WORKING TOGETHER.
Cx · Building controls · MSI · Energy · Industrial automation · QA/QC
BEFORE THE NEXT DECISION, KNOW WHERE YOU STAND.
Before testing, changing operation or accepting a handoff, know what is ready, what was demonstrated and what remains open.
SLA brings these services together around the equipment and the work your project needs. We define responsibilities, verify the agreed response and document the findings and open actions your team needs to move forward.
START WITH THE QUESTION YOU NEED ANSWERED.
Are we ready?
Commissioning: requirements, prerequisites, test results and open actions.
Why does this keep happening?
Controls: trace the instrument, logic and actual equipment response.
Who owns the connections?
MSI: defined interfaces, point mappings and responsibilities.
Did performance actually improve?
Energy: a baseline, operating conditions and an agreed verification approach.
SLA360 connects six services around your project. Engage one service or a coordinated team. Start with the system and decision that matter.
Page 2 · REAL PROJECTS. RELEVANT EXPERIENCE.
Read page 2 text
STREAMLINE AUTOMATION
WHY SLA / YOUR NEXT PROJECT DECISION
STREAMLINE AUTOMATION / Cx · CONTROLS · MSI · ENERGY · INDUSTRIAL AUTOMATION · QA/QC 02 / 12
EXPERIENCE BEHIND THE COMMITMENT
REAL PROJECTS. RELEVANT EXPERIENCE.
Give SLA a specific job: check readiness, coordinate interfaces, verify the agreed response or prepare the operating handoff. These company examples show two ways we contribute.
NTT PH3
Mesa, Arizona · Data center
INTEGRATED TESTING SUPPORT
Oversight of generator and UPS integrated testing through Apollo. SLA supported operating scenarios and the test evidence needed to assess how the systems responded together.
For your project: connect the test scenario, supporting teams and required evidence.
ASU / TNAB
Tempe, Arizona · Wilson Hall
MONITORING-BASED Cx
SLA coordinated BAS, metering and energy information system (EIS) work at Wilson Hall. We’re now performing monitoring-based commissioning (MBCx) and building a new dashboard.
For operators: trace a reading to its source and see how equipment performs over time.
MARKETS WE SERVE
Campuses & research Healthcare & life sciences Data centers
Semiconductors Central plants & utilities Manufacturing & process
Mining & heavy industry Water & wastewater Airports & transportation
Civic & public safety Federal & military Commercial & workplaces
Residential & mixed use Hospitality, sports & culture Logistics & distribution
The examples above describe SLA company work. Broader sector experience also includes Mike and Marcus’s individual careers with previous firms and project teams.
Page 3 · KNOW WHAT READY LOOKS LIKE.
Read page 3 text
STREAMLINE AUTOMATION
WHY SLA / YOUR NEXT PROJECT DECISION
STREAMLINE AUTOMATION / Cx · CONTROLS · MSI · ENERGY · INDUSTRIAL AUTOMATION · QA/QC 03 / 12
COMMISSIONING / Cx
KNOW WHAT READY LOOKS LIKE.
Before testing or handoff, know what is ready, what the systems demonstrated and what remains open. Readiness & QA/QC also supports separately scoped preparation, recovery and handover reviews across the six services.
01
Requirements
What must the system do?
02
Readiness
What must be in place?
03
Verification
What did it demonstrate?
04
Handoff
What does the owner receive?
Building enclosure Cx
Marcus Myers, BECxP
Review air, water, heat and vapor control at roofs, walls, glazing and foundations. Check transitions through submittals, mockups, observations before concealment and specified tests.
Review comments, field findings and test records.
Electrical Cx
Power, cooling and controls together.
Coordinate readiness, specialist test records and integrated testing. Check how power transfer affects cooling recovery, control power and operator information. Authorized specialists perform switching and specialist tests.
Readiness, witnessed results, issues and retests.
Lighting controls Cx
We ask about lighting when we define each building Cx scope. In the selected rooms we test wall switches, zones, overrides and after-hours schedules. Where specified, we verify occupancy response and daylight dimming against the approved sequence. The owner receives results for each tested room, exceptions and retest status.
Seven Cx scopes
New Construction Cx
Existing Building Cx · EBCx
Ongoing Cx · OCx
Monitoring-Based Cx · MBCx
Building Enclosure Cx · BECx
Electrical Cx
Data Assurance Cx · DACx
Page 4 · THE SCREEN. THE PROGRAM. THE EQUIPMENT.
Read page 4 text
STREAMLINE AUTOMATION
WHY SLA / YOUR NEXT PROJECT DECISION
STREAMLINE AUTOMATION / Cx · CONTROLS · MSI · ENERGY · INDUSTRIAL AUTOMATION · QA/QC 04 / 12
CONTROLS & AUTOMATION
THE SCREEN. THE PROGRAM. THE EQUIPMENT.
A fault keeps returning. Where is the break?
Controls panel. Representative image.
PLC · DDC · SCADA · BAS/BMS · HMI · Instrumentation · UL 508A panels
01 PLAN THE CONTROLS
Mike Valdez leads the controls team. Kim Feely, Senior Controls Engineer, connects the panel design, instrument signals and PLC logic to what operators need on screen.
02 BUILD & CONNECT
Caesar Cuevas leads field crews. Alexander Valdez builds and wires panels and commissions drives. Panel fabrication can include UL 508A work within the agreed scope.
03 PROGRAM & INVESTIGATE
When a fault returns, we compare the command, instrument feedback and equipment response. Derek Valdez traces the field signals and the industrial networks carrying them.
04 HAND OVER & SUPPORT
Your operators receive the agreed programs, backups and drawings. Ashlee Welch coordinates site visits and daily records so the crew knows what is ready to test.
Compare the command, the feedback and the equipment’s response.
Page 5 · MSI. MASTER SYSTEMS INTEGRATION.
Read page 5 text
STREAMLINE AUTOMATION
WHY SLA / YOUR NEXT PROJECT DECISION
STREAMLINE AUTOMATION / Cx · CONTROLS · MSI · ENERGY · INDUSTRIAL AUTOMATION · QA/QC 05 / 12
SYSTEMS, VENDORS & OPERATING INFORMATION MSI.
MASTER SYSTEMS INTEGRATION.
Several vendors. Different platforms. SLA defines the interfaces, point information and responsibilities so your team can verify the connections it depends on.
Building automation
Power & metering
Plant & vendor systems
VERIFY
Identity Units & time Mapping Responsibilities
OWNER’S OPERATING VIEW
Right asset. Usable information. Traceable records.
Local systems retain their operating and protection functions.
Division 25
Make integration a requirement.
Define architecture, point naming, units, timestamps, alarms, trends and permitted commands. Set interface responsibilities, owner access requirements and verification criteria in the project documents.
Digital Twins
Give data an asset and a purpose.
Connect operating information with equipment identity, relationships and records. Start with the owner’s use case, then define the asset information, verification records and responsibilities for keeping them current.
Available today: project-scoped integration, asset information and verification. A unified SLA360 digital-twin platform remains a development concept.
Page 6 · UNDERSTAND THE USE. VERIFY THE CHANGE.
Read page 6 text
STREAMLINE AUTOMATION
WHY SLA / YOUR NEXT PROJECT DECISION
STREAMLINE AUTOMATION / Cx · CONTROLS · MSI · ENERGY · INDUSTRIAL AUTOMATION · QA/QC 06 / 12
ENERGY & BUILDING PERFORMANCE
UNDERSTAND THE USE. VERIFY THE CHANGE.
When energy use, comfort, moisture or ventilation raises questions, investigate the enclosure, HVAC, lighting, controls, occupancy and operating schedules together.
kWh
ENERGY USE
10 kW × 2,000 hours = 20,000 kWh per year
Lighting example: this estimate assumes a 10 kW average load difference across 2,000 excess hours each year. Verify both with meter and schedule records.
Energy audits
ASHRAE Levels 1, 2 and 3, with investigation depth matched to the decision and the opportunities being evaluated.
Facility & property assessments
Review visible conditions, renewal needs and repair priorities. Match the FCA or PCA scope to the owner’s decision.
Metering & data assurance
Check coverage, point identity, units and trend quality before the information becomes a performance finding.
Monitoring & ongoing performance
After a change, check demand and energy against the baseline. Account for hours, occupancy, weather and meter coverage before confirming savings.
Your result: a documented baseline, prioritized findings, proposed actions and an agreed way to assess the effect of approved changes.
Page 7 · HOW DO YOU UPGRADE A PLANT THE CAMPUS STILL NEEDS?
Read page 7 text
STREAMLINE AUTOMATION
WHY SLA / YOUR NEXT PROJECT DECISION
STREAMLINE AUTOMATION / Cx · CONTROLS · MSI · ENERGY · INDUSTRIAL AUTOMATION · QA/QC 07 / 12
ARIZONA STATE UNIVERSITY / MISSION-CRITICAL CENTRAL PLANTS HOW DO YOU UPGRADE A PLANT THE CAMPUS STILL NEEDS?
Mike Valdez and Streamline wrote the control software that runs ASU’s central plants. For nearly a decade, ASU has turned to our team to maintain those systems across its campuses, from the pump in the field to the operator’s screen.
HOW OPERATORS CHECK STORED COOLING / ILLUSTRATIVE EXAMPLE 2,000 tons sustained for 3 hours = 6,000 ton-hours delivered
Flow and temperature difference tell operators the cooling rate. Tracking that rate over time gives ton-hours.
TEMPE & POLYTECHNIC Plant controls, SCADA and metering
Mike leads plant metering and controls. His team upgraded Tempe Central Plant SCADA, connects meters to ASU’s energy information system (EIS), and supports the North Plant, the existing thermal storage system and Polytechnic’s chiller plants in Mesa.
TEMPE DISTRICT UTILITY PLANT Controls, QA/QC and readiness
Mike leads SLA’s controls work at TDUP. Marcus helps operators, trades and vendors coordinate. Before a mode change, we ask what must already be running, what depends on it and who needs to be there to see the response.
CENTRAL PLANT / 104129 Electrical commissioning
Marcus Myers leads SLA’s electrical Cx for ASU’s Central Plant transformer and switchgear replacement. He coordinates cutover readiness, reviews NETA acceptance-test records and defines how the team will verify breaker status, alarms and metering. Authorized electrical crews perform switching.
ASU is home. We care about the people who run it. Mike.Valdez@streamline-automation.com
Page 8 · WHEN POWER TRANSFERS, WHAT HAS TO RECOVER?
Read page 8 text
STREAMLINE AUTOMATION
WHY SLA / YOUR NEXT PROJECT DECISION
STREAMLINE AUTOMATION / Cx · CONTROLS · MSI · ENERGY · INDUSTRIAL AUTOMATION · QA/QC 08 / 12
MISSION-CRITICAL FACILITIES / COMMISSIONING & CONTROLS WHEN POWER TRANSFERS, WHAT HAS TO RECOVER?
Power is back. Can the facility resume work? In a data hall, cooling must recover. In a fab, a tool needs stable utilities. In a lab, exhaust must restore the pressure relationship at the door. Our Cx and controls technicians work through those handoffs with your operators.
Data centers
Did critical cooling recover in time?
Semiconductor fabs
Did the tool receive its utility-ready signal?
Laboratories
Did exhaust restore the required room pressure?
COMMISSIONING & TRAINING Marcus Myers
For five years, Marcus led commissioning and energy auditing at a global A/E firm. He oversaw Cx teams serving data centers, semiconductor facilities and labs. He led energy audits of data centers and offices nationwide and worked on HVAC and controls Cx at Vancouver Clinic’s laboratory.
INDUSTRIAL CONTROLS Mike Valdez
Mike brings 35+ years in controls, including chemical delivery, slurry and waste dilution. At Microchip Technology in Tempe, SLA services and programs fab and sub-fab equipment. Mike traces startup interlocks from the field instrument through the PLC to the tool.
ASHRAE Marcus is a voting member of the group developing Guideline 1.6P for data centers and chairs the group developing Guideline 1.7P for semiconductor fabs.
ON YOUR PROJECT Before the witness test
Marcus coordinates test windows, trades and operators. Mike traces signals and interlocks. In an illustrative test, power returns at 0:15 and cooling stabilizes at 2:15. That is two minutes of recovery after power returns. The owner’s criteria determine whether it passes.
Send your next test window and staffing needs. Marcus.Myers@streamline-automation.com
Page 9 · WHICH METER IS BEHIND THAT ALARM?
Read page 9 text
STREAMLINE AUTOMATION
WHY SLA / YOUR NEXT PROJECT DECISION
STREAMLINE AUTOMATION / Cx · CONTROLS · MSI · ENERGY · INDUSTRIAL AUTOMATION · QA/QC 09 / 12
INDUSTRIAL AUTOMATION / METERING, ANALYTICS & DIGITAL TWINS WHICH METER IS BEHIND THAT ALARM?
Mike and Marcus each bring more than a decade of digital twin experience. Their starting point is the operator’s question. Which pump ran overnight? Did it draw power? The meter, the controls and the dashboard have to tell the same story.
VIEW MIKE’S SESSION / SIEMENS REALIZE LIVE
Can a cooling-tower model reproduce what the plant does?
Mike and Marcus presented how to prepare plant controls and data for a digital twin. We compare the model against field measurements before using it to evaluate a change.
DIVISION 25 & MSI Follow the point
Division 25 defines the interfaces and what each vendor must demonstrate. As master systems integrator (MSI), SLA checks point identity, units, scaling and timestamps. At ASU’s ISTB12, SLA coordinated metering and fault detection and diagnostics (FDD) integration.
ASU / WILSON HALL Metering, dashboards and MBCx
SLA coordinated the building controls, metering and energy information system (EIS). The team is performing monitoring-based commissioning (MBCx) and developing a dashboard. ASU asked for chilled-water and electrical meter trends along with the underlying readings.
FDD IN PRACTICE Investigate the alert
Illustrative case. A pump averages 12 kW for eight hours scheduled off. That is 96 kWh to investigate. Mike checks the circuit and local override. Marcus confirms the intended schedule with the owner. After a correction, the team compares the same hours on the meter to see what changed.
Which reading does your team need to trust? Mike.Valdez@streamline-automation.com
Page 10 · TWO PARTNERS. ONE ACCOUNTABLE TEAM.
Read page 10 text
STREAMLINE AUTOMATION
WHY SLA / YOUR NEXT PROJECT DECISION
STREAMLINE AUTOMATION / Cx · CONTROLS · MSI · ENERGY · INDUSTRIAL AUTOMATION · QA/QC 10 / 12
THE PEOPLE CARRYING THE WORK THROUGH
TWO PARTNERS. ONE ACCOUNTABLE TEAM.
Mike Valdez
FOUNDER, CEO & PARTNER
U.S. Navy Seabee veteran. Mike has worked in controls since 1990, from PLC programming to plant-wide SCADA.
Marcus Myers
CTO & PARTNER
25+ years across construction, Cx and energy. Leads enclosure, integration and building performance investigations.
OFFICE OPERATIONS
Teresa Valdez
Office Controller / Manager
PROJECT COORDINATION
Ashlee Welch
Project Manager | Cx Coordination
FIELD, CONTROLS & Cx
Kim Feely Senior Controls Engineer
Derek Valdez Process instruments and industrial networks
Alexander Valdez Control panels, drives and industrial networks
Caesar Cuevas Field crew leadership and controls quality checks
Jacob Randt Shop and field panel work
Levi Jensen SCADA energy displays and dashboard layouts
Collin Hanshew Control panels and field connections
Matthew Valdez Installation and readiness checks
Caleb Cluff Field automation for solar and central plant work
Ryan Welch Field service and electrical drawings
MARCUS / PRIOR-FIRM LIGHTING EXPERIENCE
His fifth-floor Cx scope at the Inter-American Development Bank included lighting controls and metering. At Ko‘ula, his work included lighting functional-test documentation.
Marcus: CxA · BECxP · CEM · LEED AP BD+C · Assoc. AIA · LFA
Career years include prior firms. Partner involvement and staffing are agreed for each project.
Page 11 · WHAT SHOULD YOU FIX FIRST, AND WHAT CAN WAIT?
Read page 11 text
STREAMLINE AUTOMATION
WHY SLA / YOUR NEXT PROJECT DECISION
STREAMLINE AUTOMATION / Cx · CONTROLS · MSI · ENERGY · INDUSTRIAL AUTOMATION · QA/QC 11 / 12
ENERGY AUDITS / BUILDING SCIENCE / SUSTAINABILITY WHAT SHOULD YOU FIX FIRST, AND WHAT CAN WAIT?
A chiller near the end of its useful life is one budget decision. A healthy chiller running all night is another. We help your team tell the difference before you commit the money.
MARCUS MYERS / PRIOR CAREER EXPERIENCE
Marcus led regional and global energy services and used energy modeling to guide sustainability investments. As a consultant to Ameresco, he led campus-wide controls and pumping due diligence and supported selected-building assessments for ASU’s climate neutrality planning.
ENERGY & CARBON Compare your options
An energy audit shows where to investigate. An energy model can compare a schedule change, equipment upgrade or electrification scenario against a common baseline. The owner can see which assumptions drive the cost and carbon estimates.
CONDITION & CAPITAL Plan repairs and renewal
Buying a property? A property condition assessment (PCA) can follow ASTM E2018 when specified. For a facility or building condition assessment (FCA or BCA), we agree on assets, access and rating criteria, then organize repair priorities for your budget.
BUILDING SCIENCE Find the cause
A ceiling stain can trace to a roof leak, a cold pipe or humid air entering a wall. A focused forensic investigation uses the timing, site observations and targeted measurements to narrow the cause and recommend the next test or repair.
Cx & OPERATIONS Check the result
Mike’s controls team can trace what the equipment actually does. Marcus works with operators to retest the approved change. Meter trends and fault detection can show whether the improvement holds as schedules or seasons change.
Which decision is on your next capital plan? Marcus.Myers@streamline-automation.com
Page 12 · LOCAL TO ARIZONA. TRUSTED NATIONALLY.
Read page 12 text
STREAMLINE AUTOMATION
WHY SLA / YOUR NEXT PROJECT DECISION
STREAMLINE AUTOMATION / Cx · CONTROLS · MSI · ENERGY · INDUSTRIAL AUTOMATION · QA/QC 12 / 12
WHERE WE WORK
LOCAL TO ARIZONA. TRUSTED NATIONALLY.
Based in Tempe. Available for projects across the U.S. and internationally.
TEMPE / NATIONWIDE WORLDWIDE REACH
Illustrative reach. International locations include Mike and Marcus’s career experience with previous firms. Staffing and coverage are agreed for each assignment.
NORTH AMERICA
Canada · Mexico
EUROPE
United Kingdom, including Scotland · Ireland · France · Germany · Austria · Italy · Russia
ASIA & PACIFIC
China · Japan · South Korea · Taiwan · Singapore · Malaysia · Australia
MIDDLE EAST & AFRICA
Israel · Africa (regional reference)
Bring us the system, the problem and the next milestone.
START WITH ONE DEFINED SCOPE.
Mike Valdez / CEO & Partner
Mike.Valdez@streamline-automation.com
Marcus Myers / CTO & Partner
Marcus.Myers@streamline-automation.com
602-438-6061 3025 S. 48th St., Suite 103 · Tempe, AZ 85282