StreamlineAutomation

STREAMLINE AUTOMATION / CONNECTED PERFORMANCE

Project experience.
Field work and evidence.

Find a facility like yours and see the role we played, from generator and UPS testing oversight to campus controls and metering.

See how the team checked the rooftop units at Mercado B and C

LEADERSHIP & DELIVERY

Experience at the project.
Perspective across the portfolio.

From 2020 to 2025, Marcus served as Principal-in-Charge and Global Discipline Lead for Commissioning and Energy Auditing*. His responsibilities connected project delivery, technical teams and commissioning and energy services across markets.

Mike brings controls, electrical and industrial-automation experience, from plant systems and process equipment to the information operators use every day.

Meet Mike and Marcus

PROJECT EXPERIENCE

Explore the work.
See what connects.

Choose a sector to see the facility and the actual assignment. An asterisk marks experience gained with a previous firm.

Commercial & workplaces 14 examples

Sonoran Studio*

Phoenix, Arizona

Building / facility
Architectural office
Work
Energy modeling and Cx
Size
5,100 sq ft · architectural office

Energy modeling and Cx for the architectural workplace of Architectural Resource Team. The urban infill building combines a solar-powered energy strategy with captured-water systems and on-site treatment.

The completed building achieved Living Building Challenge certification and received Arizona Forward’s 2025 Crescordia Award for Buildings, Structures and Landscape Design.

Living Building Challenge

Sonoran Studio building

Sonoran Studio’s Living Building certification
2025 Crescordia Award

Buildings, Structures and Landscape Design

2025 Crescordia Award for Sonoran Studio

Inter-American Development Bank: third-, fifth- and sixth-floor renovations*

Washington, D.C.

Building / facility
Headquarters office renovations
Work
Cx Authority for office-renovation work

Commissioning for third-, fifth- and sixth-floor renovations at 1300 New York Avenue NW. The fifth-floor Cx Authority scope included VAV and building automation systems, lighting controls, metering, indoor-air-quality sensors, water heaters and interfaces with existing controls.

LEED Platinum | headquarters building

1300 New York Avenue NW headquarters building

IDB headquarters’ LEED Platinum certification

Chevron: HOU140 and HOU150 renovation Cx*

Houston, Texas

Building / facility
High-rise office renovations
Work
Building-renovation and system-upgrade Cx
Size
HOU140: 1,267,000 sq ft · office building
HOU150: 1,300,000 sq ft · office building

Renovation Cx at HOU140, 1400 Smith Street, and HOU150, 1500 Louisiana Street. HOU150 assignments included floors 31–39, first-floor upgrades, health and medical spaces, and eleventh-floor lighting-controls coordination.

Salesforce Tower*

San Francisco, California

Building / facility
High-rise office building and tenant workplace
Work
High-rise office Cx
Size
About 1.4 million sq ft · office building

Cx experience at Salesforce Tower, a 61-story office building, and the separate Accenture workplace within it. The portfolio spans base-building and tenant-improvement assignments, with the tower’s LEED Core and Shell certification applying to the building.

LEED Platinum | Core and Shell

Core and Shell certification for Salesforce Tower

Salesforce Tower’s LEED Platinum certification

Amazon: Yale & Thomas offices*

Seattle, Washington

Building / facility
Technology-company offices
Work
Office tenant-improvement Cx
Size
168,000 sq ft · tenant improvement

Cx for the Yale & Thomas office tenant improvement. The build-out included office ventilation and cooling, dedicated equipment-room and transformer cooling, and food-service support systems.

Maritime Building*

Seattle, Washington

Building / facility
Historic office and retail building
Work
Office-building Cx and LEED-related services
Size
211,640 sq ft · building

Cx and LEED support for the renovation of a 1911 heavy-timber building into contemporary office and retail space.

Visa Bellevue*

Bellevue, Washington

Building / facility
Financial-services workplace
Work
Office tenant-improvement Cx and LEED-related services
Size
53,000 sq ft · office interior

Cx and LEED support for the Bellevue office tenant improvement. The office interior achieved LEED Silver in 2020 within a separately Gold-certified host building.

LEED Silver | office interior

Bellevue office interior, 2020

Bellevue office’s LEED Silver certification (PDF p. 10)

T. Rowe Price: 333 Bush Street*

San Francisco, California

Building / facility
Financial-services tenant workplace
Work
Occupied-office tenant-improvement Cx
Size
10,000 sq ft · tenant improvement

Cx for a two-phase refresh and expansion of the occupied 25th-floor workplace at 333 Bush Street. The tenant-improvement project included MEP and lighting upgrades.

Esterra Park Block 3*

Redmond, Washington

Building / facility
Office building
Work
Office-building Cx and LEED-related services
Size
246,500 sq ft · office building

Cx and LEED support for the seven-floor Block 3 office building, also known as One Esterra Park. The technology workplace includes flexible infrastructure and substantial power capacity.

LEED Gold

Esterra Park Block 3 office building

Esterra Block 3’s LEED Gold certification

Valve Software offices*

Bellevue, Washington

Building / facility
Technology-company headquarters
Work
Office tenant-improvement Cx
Size
135,500 sq ft · office interiors

Cx for Valve’s headquarters interiors in Lincoln Square. The workplace spans nine contiguous floors, with office and amenity spaces for the software company.

74 South Jackson / The Jack*

Seattle, Washington

Building / facility
Office building
Work
Office-development Cx
Size
171,294 sq ft · office project

Cx experience on the 74 South Jackson office development, now known as The Jack. The seven-story Pioneer Square building includes a rooftop amenity and below-grade parking.

2598 Bayshore Parkway*

Mountain View, California

Building / facility
Office building
Work
Commercial-building Cx

Commercial-building Cx at the North Bayshore office property in Mountain View.

Marion Street Office Building*

Seattle, Washington

Building / facility
Office building
Work
Office-building Cx

Cx for an office-building assignment in Seattle.

Campuses & education 24 examples

SLA PROJECT WORK

ASU Wilson Hall / TNAB: operating systems integration

Tempe, Arizona

Building / facility
Academic building
Work
MSI, FDD, EIS and monitoring-based Cx
Size
178,000 sq ft · building

At Wilson Hall, SLA links readings in the energy information system to the building automation points and equipment they describe. During monitoring-based Cx, the team can trace a performance indicator back to its source, investigate a possible fault and report what needs follow-up.

LEED Gold

Wilson Hall building certification

Read ASU’s Wilson Hall LEED Gold announcement

SLA PROJECT WORK

ASU Bateman Physical Sciences Center, H Wing

Tempe, Arizona

Building / facility
Science and teaching laboratories
Work
MSI, Division 25 and monitoring-based Cx
Size
131,710 sq ft · H-wing renovation

On the H Wing renovation, ASU, its controls contractor and the project team are working through how equipment and control points should be named for monitoring. Marcus reviewed the contractor’s naming list against the project requirements and recommended keeping it as the working baseline. His review identified the exceptions ASU still needed to decide, so the team could distinguish settled items from open questions.

SLA PROJECT WORK

ASU Interdisciplinary Science and Technology Building 12

Mesa, Arizona

Building / facility
Manufacturing research and engineering-education building
Work
MSI, FDD coordination and EIS data readiness
Size
173,194 sq ft · building

SLA coordinated building controls data, metering and vendor interfaces for ASU’s monitoring team. In July 2026, SLA distributed its integration status and closeout report to ASU and the project team. It documented completed work, remaining responsibilities and the transition to monitoring-based Cx.

SLA PROJECT WORK

ASU Health headquarters

Phoenix, Arizona

Building / facility
Medical and health-sciences education headquarters
Work
Owner-side MSI and Division 25 coordination
Size
173,000 sq ft · planned building

SLA coordinated the owner’s Division 25 design reviews for the planned health sciences headquarters. The reviews addressed what operating data the controls and meters need to provide and who will verify it.

SLA PROJECT WORK

ASU Mercado Buildings B and C

Phoenix, Arizona

Building / facility
Existing academic and health-education facilities
Work
Existing-building Cx and closeout
Size
B: 24,473 sq ft; C: 62,287 sq ft · host buildings

ASU renovated the spaces and kept the older rooftop units. Marcus developed a unit-by-unit checkout so the team could compare what the controls showed with how the equipment served the rooms. An unusual trend led to a thermostat wiring correction. Gilbane confirmed the unit then operated and trended as intended.

ASU College Avenue Commons*

Tempe, Arizona

Building / facility
Academic building and teaching laboratories
Work
Building-performance monitoring and instrumentation
Size
137,000 sq ft · building

Monitoring project designer and manager

Designed and implemented monitoring that connected building-envelope, classroom and HVAC measurements to ASU’s energy information. The work included sensor and instrumentation coordination and enclosure/mechanical Cx coordination within the monitoring project.

ASU Farmer Education Building*

Tempe, Arizona

Building / facility
Academic / education building
Work
Existing-building HVAC Cx
Size
About 96,000 sq ft · building

Cx for an HVAC renovation in the existing education building, covering replacement air-handling units, more than 100 VAV boxes and the associated controls. The assignment addressed replacement equipment and its operation within the building’s existing systems.

ASU Music Building*

Tempe, Arizona

Building / facility
Music education and performance building
Work
Envelope and MEP consultant
Size
Approximately 88,000 sq ft in the project assessment narrative

Assessed the existing mechanical systems and building enclosure, with pre-design energy modeling, load calculations and hygrothermal analysis. This was assessment and modeling work to inform the building’s next design decisions.

ASU student-housing assessments*

ASU campuses, Arizona

Building / facility
University student housing
Work
Facility condition assessment
Size
Assessment phases of 1.7 million and 1.1 million sq ft

The two assessment phases covered 1.7 million and 1.1 million square feet of ASU housing. The team examined energy systems and building enclosures alongside deferred maintenance and replacement costs so ASU could weigh future repairs and renewals.

ASU ISTB7 / Walton Center for Planetary Health*

Tempe, Arizona

Building / facility
Interdisciplinary science and research building
Work
Construction-phase Cx support, MEP coordination, TAB and EIS
Size
281,000 sq ft · building

Construction manager’s internal Cx consultant

Construction-manager Cx support, including MEP coordination, testing and balancing, energy information systems and system turnover, alongside the owner’s independent Cx team.

LEED Platinum

Walton Center for Planetary Health / ISTB7

See ASU’s Walton Center LEED Platinum profile

ASU MacroTechnology Works*

Tempe, Arizona

Building / facility
Cleanrooms and semiconductor research laboratories
Work
Commissioning leadership
Size
261,188 sq ft · host facility

Cx Principal-in-Charge

Cx leadership for cleanroom and research-laboratory work in Areas 4 and 5, including the process utilities serving those spaces.

ASU Polytechnic chiller plant / P3*

Mesa, Arizona

Building / facility
Campus chiller plant
Work
Chiller-plant commissioning

Cx experience on the Polytechnic campus chiller-replacement project and leadership of the Chiller Plant 3 assignment. The work addressed campus cooling infrastructure; SLA’s later controls and EIS services are listed separately.

ASU Farrington Softball Stadium / Alber Locker Room Expansion*

Tempe, Arizona

Building / facility
Softball stadium locker rooms and support spaces
Work
Commissioning and project management
Size
6,372 sq ft · locker-room expansion

Project Manager and Cx Authority

Fundamental and enhanced Cx for the office, locker-room and support-space expansion at the existing softball facility.

LEED Gold

Alber Locker Room Expansion, Commercial Interiors

See ASU’s LEED Gold entry for the Alber locker rooms

ASU Creative City Center*

Phoenix, Arizona

Building / facility
Academic facility
Work
LEED administrator and energy/Cx consultant

LEED administration, energy-performance support and Cx for the academic facility.

ASU Los Angeles Film School*

Los Angeles, California

Building / facility
Film school and teaching facility
Work
LEED administrator and energy-performance consultant

LEED administration and energy-performance/modeling support for ASU’s Los Angeles Film School assignment.

ASU ISTB X controls-upgrade study*

Tempe, Arizona

Building / facility
University academic and research building
Work
Building-controls upgrade study

Completed a building-controls upgrade study in 2023 for ISTB X, formerly Wrigley Hall. The building houses ASU’s School for the Future of Innovation in Society.

LEED Silver

ISTB X / Wrigley Hall building certification.

See ASU’s ISTB X LEED Silver profile

ASU West Campus chilled-water study*

Phoenix, Arizona

Building / facility
Campus chilled-water system
Work
Chilled-water system study

Completed a chilled-water study for ASU’s West campus in 2023. The assignment examined existing campus cooling infrastructure within the energy and facility-assessment portfolio.

UT Permian Basin Engineering Building*

Midland, Texas

Building / facility
University engineering classrooms, studios and laboratories
Work
Commissioning
Size
105,801 sq ft · Engineering Building

Cx experience for the university’s Engineering Building on its Midland campus. The facility brings teaching and research laboratories together with classrooms, design studios and student collaboration spaces.

Texas Christian University Administration Building*

Fort Worth, Texas

Building / facility
University administration building
Work
Building enclosure Cx
Size
95,658 sq ft · building

LEED v4 building enclosure Cx for the university’s Administration Building in Fort Worth, with a defined specialty in enclosure performance.

Harrisburg University Health Sciences Building*

Harrisburg, Pennsylvania

Building / facility
Health-sciences education and research tower
Work
Building-enclosure design-detail coordination
Size
260,000 sq ft · university tower

Building-envelope design consultant

Building-enclosure design-detail coordination for the Health Sciences Building, now the UPMC Health Sciences Tower. The university facility supports healthcare education, simulation laboratories, advanced manufacturing and research.

Caliber Charter School*

Vallejo, California

Building / facility
K–8 school campus
Work
Commissioning
Size
60,000 sq ft · school campus

Cx for Caliber Charter School in Vallejo, California.

Ann Arbor Public Schools: Community and Tappan*

Ann Arbor, Michigan

Building / facility
Public schools
Work
HVAC and controls commissioning

Cx for Community and Tappan schools included review of BAS trend-point lists and controls matrices, sensor-calibration requirements and alarm-verification responsibilities. The work connected equipment data and alarms with the district’s operating requirements.

SLA PROJECT WORK

ASU campus EIS and instrumentation

Tempe and Mesa, Arizona

Building / facility
University campus utility and metering systems
Work
EIS upgrades and instrumentation service

Upgrades and service for ASU’s Energy Information System and field instrumentation, including the Tempe Central Plant and Polytechnic campus. The work connects physical measurements with campus operating information.

Laboratories & research 11 examples

SLA PROJECT WORK

ASU Downtown Phoenix MRI Building

Phoenix, Arizona

Building / facility
University MRI facility
Work
Targeted EIS and metering Cx

SLA reviewed meter point mapping, units and scaling, and coordinated checks of trend history. That gives Facilities a way to check whether a change on screen reflects energy use or how the meter reading is displayed.

UTMB Galveston National Laboratory upgrades*

Galveston, Texas

Building / facility
High-containment research laboratory
Work
Laboratory Cx
Size
174,000 sq ft · host laboratory building

Cx experience associated with upgrades at the high-containment Galveston National Laboratory.

NYCEDC Public Health Laboratory*

New York, New York

Building / facility
Public-health laboratory
Work
Preconstruction Cx coordination
Size
240,000 sq ft · laboratory building

Principal-in-Charge for preconstruction Cx

Led preconstruction Cx coordination for the new public-health laboratory, including the workplan, critical milestones, responsibility matrices and monthly reporting.

Legend Technical Services Laboratory*

Phoenix, Arizona

Building / facility
Analytical laboratory
Work
Commissioning

Cx at Legend Technical Services Laboratory in Phoenix.

Vancouver Clinic laboratory*

Vancouver, Washington

Building / facility
Clinical / pathology laboratory
Work
Commissioning
Size
10,600 sq ft · laboratory scope

Cx Authority

Cx Authority for HVAC, controls, lighting and plumbing serving clinical and pathology laboratory space within an existing facility in Vancouver, Washington.

Skidmore Center for Integrated Sciences, Phase 1A*

Saratoga Springs, New York

Building / facility
Teaching laboratories and vivarium
Work
Commissioning and project management
Size
58,000 sq ft · Phase 1A / North Wing

Project Manager and Cx Authority

Fundamental and enhanced MEP Cx and building enclosure Cx for the new Phase 1A teaching and research facility, including laboratory and vivarium spaces. The assignment was one phase of a wider development that also included renovations.

Getty Conservation Institute Science Department*

Los Angeles, California

Building / facility
Conservation science laboratories and support offices
Work
Commissioning
Size
30,000 sq ft · laboratory and support-space project

Cx Authority

Cx Authority for science-laboratory and support-office renovations in the East Building and related museum areas, serving the Conservation Institute’s research activities.

Chevron laboratory (facility name withheld)*

Houston area, Texas

Building / facility
Research laboratories and support facilities
Work
Project manager and Cx team member

Marcus’s team won the assignment. Before leaving the firm, he helped start the project and coordinated early commissioning work for laboratory utilities and Division 25 interfaces with the owner’s operations and IT teams, designers, contractors and controls providers.

Cornell Schurman Hall laboratory renovation*

Ithaca, New York

Building / facility
Clinical pathology and comparative coagulation laboratories
Work
Fundamental LEED v4 Cx; discipline leadership
Size
15,000 sq ft · laboratory renovation

Global Discipline Lead

Fundamental LEED v4 Cx for renovation of the clinical pathology and comparative coagulation laboratories. The team’s scope covered mechanical systems, BAS, lighting controls and domestic hot water, with substantial completion in 2020.

Ridgeway Science and Technology*

Boulder, Colorado

Building / facility
Science and technology facility
Work
Commissioning

Cx Authority

LEED v4 fundamental and enhanced Cx, including the building enclosure Cx option, for the science-and-technology project in Boulder.

SLA PROJECT WORK

University of Arizona field-scanning gantry

Maricopa, Arizona

Building / facility
Agricultural research and field-imaging installation
Work
Gantry controls and automation support

Technical work on the field-scanning gantry used to image crops in agricultural research. The installation spans a two-acre test field and supports investigation of crop traits and drought response.

Healthcare & medical facilities 14 examples

Via Christi St. Joseph Hospital*

Wichita, Kansas

Building / facility
Hospital
Work
Hospital-renovation Cx

Commissioning experience for the hospital’s renovation program in Wichita, including the assignment identified as Project Renewal.

Via Christi St. Francis Hospital*

Wichita, Kansas

Building / facility
Hospital
Work
Hospital-renovation Cx

Cx experience across multiple renovation assignments at Via Christi St. Francis in Wichita, Kansas.

Rose Medical Center*

Denver, Colorado

Building / facility
Hospital operating-room floor
Work
Commissioning project management

Cx project manager

Managed retro-Cx for HVAC upgrades serving the operating-room floor at Rose Medical Center in Denver.

Porter Adventist Neighborhood Health Center*

Denver, Colorado

Building / facility
Neighborhood health center
Work
Commissioning management
Size
24,000 sq ft · health center

Managed Cx for Porter Adventist Hospital’s new freestanding Neighborhood Health Center in Denver.

Denver Health Medical Center*

Denver, Colorado

Building / facility
Hospital / medical center
Work
Commissioning

Cx at Denver Health Medical Center.

Memorial Hospital West*

Pembroke Pines, Florida

Building / facility
Hospital clinical departments
Work
Clinical-department Cx

Cx assignments in interventional radiology, operating rooms, clinic space and the catheterization laboratory at Memorial Hospital West.

Memorial Healthcare System Pharmacy*

Miramar, Florida

Building / facility
Healthcare pharmacy
Work
Commissioning project management

Cx project manager

Cx project management for pharmacy and associated clinical-system assignments. Related work across the Memorial hospital network included new and retro-Cx for operating rooms and catheterization laboratories, boiler and generator testing, pharmacies and USP 800 testing.

St. Francis Medical Center, Honolulu*

Honolulu, Hawaii

Building / facility
Hospital addition and central plant
Work
Commissioning project management

Cx project manager

Managed new and retro-Cx components of a hospital addition and the connection of a new central plant to the existing facility. The work brought the addition, plant connection and existing operating systems into the Cx scope.

Kaiser Permanente Honolulu Medical Office*

Honolulu, Hawaii

Building / facility
Medical office building
Work
HVAC and electrical replacement

Separate assignments covered VAV replacement and electrical-gear replacement at the Honolulu medical office.

Kaiser Permanente Cyber Building*

Denver, Colorado

Building / facility
Healthcare office / support building
Work
Renovation Cx

Commissioning-related experience for renovations at Kaiser Permanente’s Cyber Building in Denver.

Oklahoma University Medical Center*

Oklahoma City, Oklahoma

Building / facility
Medical center
Work
Assessment and retro-Cx

Facility assessment work that led to retro-Cx at the medical center. This links investigation of an existing facility with a subsequent commissioning response.

Dell Children’s Specialty Pavilion Medical Office Building*

Austin, Texas

Building / facility
Pediatric specialty medical-office building
Work
Commissioning

Cx for the Specialty Pavilion medical-office building in Austin.

TOCA MRI Facility*

Tempe, Arizona

Building / facility
MRI imaging facility
Work
Commissioning

Commissioning experience for the TOCA MRI imaging facility in Tempe.

Vancouver General Hospital: Jim Pattison Pavilion*

Vancouver, British Columbia

Building / facility
Hospital pavilion
Work
Healthcare energy audit
Size
400,000 sq ft · hospital audit facility

Energy audit and systems-controls review for Jim Pattison Pavilion, including Level 2 audit and energy-modeling work.

Residential, hotels & venues 17 examples

17W / Union Denver*

Denver, Colorado

Building / facility
Residential towers, retail and shared amenities
Work
Mixed-use project Cx
Size
465,889 sq ft · mixed-use project

Cx experience on the 17W development, now known as Union Denver at 1777 Wewatta. Three residential towers share retail, parking and amenity spaces next to Union Station.

Ae‘o, Ward Village Block M*

Honolulu, Hawaii

Building / facility
Residential tower and mixed-use development
Work
Residential and mixed-use Cx
Size
1,307,000 sq ft · tower, retail and parking

Commissioning experience on Ae‘o, including phased assignments within the residential and mixed-use tower at Ward Village Block M.

LEED Silver

Ae‘o building certification

Ae‘o’s LEED Silver certification

Ko‘ula, Ward Village Block I*

Honolulu, Hawaii

Building / facility
Residential tower and mixed-use development
Work
Commissioning
Size
941,000 sq ft · building / mixed-use project

Cx Authority

Connected functional testing and enhanced Cx reporting with current facility requirements, operating and maintenance information, and an ongoing Cx plan. Work included lighting functional-test documentation and the enhanced Cx final report.

LEED Gold

Ko‘ula building certification

Kō‘ula’s LEED Gold certification

Ward Village Block C*

Honolulu, Hawaii

Building / facility
Residential tower and mixed-use development
Work
Commissioning

Cx experience on Ward Village’s Block C residential and mixed-use development in Honolulu.

Ulana, Ward Village Block F*

Honolulu, Hawaii

Building / facility
Residential tower
Work
Residential Cx
Size
Approximately 1 million sq ft · residential project

Residential Cx at Ulana Ward Village, Block F, with work active in 2023–2024.

Parkside Residential*

Denver, Colorado

Building / facility
Residential development
Work
Commissioning

Cx for Parkside Residential in Denver.

Embassy Suites central plant, Honolulu*

Honolulu, Hawaii

Building / facility
Hotel central plant
Work
Assessment and retro-Cx

A central-plant assessment at the existing hotel led to retro-Cx, connecting the facility investigation with a commissioning response.

One Snowmass*

Snowmass Village, Colorado

Building / facility
Mixed-use residential and hospitality development
Work
Commissioning
Size
165,000 sq ft · mixed-use project

Cx experience for the One Snowmass mixed-use development in Snowmass Village.

Mountain View Hotel*

Mountain View, California

Building / facility
Hotel
Work
Commissioning

Commissioning experience for Mountain View Hotel in Mountain View, California.

Marriott / Starwood hotel energy audits*

Phoenix and Scottsdale, Arizona; Atlanta, Georgia; Los Angeles, California

Building / facility
Hotels
Work
Level 2 energy audits

Level 2 energy audits across hotel properties in Phoenix, Scottsdale, Atlanta and Los Angeles. The work examined energy use and improvement opportunities in operating hospitality facilities.

Residential design, remodeling and energy upgrades*

Arizona

Building / facility
Residential buildings
Work
Owner and residential designer/remodeler

Residential design-build and remodeling, energy upgrades and analysis, energy audits, solar hot-water systems and related residential systems.

The Edition Hotel*

Los Angeles, California

Building / facility
Hotel and residences
Work
Commissioning
Size
Approximately 300,000 sq ft · hotel and residences

Cx for The Edition Hotel in the Los Angeles area.

Great Wolf Lodge, Scottsdale*

Scottsdale, Arizona

Building / facility
Hotel and indoor water park
Work
Building enclosure Cx
Size
396,016 sq ft · resort project

Building enclosure Cx for the hotel and indoor-water-park development in Scottsdale, Arizona.

USC baseball facility*

Los Angeles, California

Building / facility
University baseball and athletics facility
Work
Commissioning

Commissioning for the university’s baseball facility.

Civic, aviation & public facilities 20 examples

SLA PROJECT WORK

John S. McCain III Library and Museum

Tempe, Arizona

Building / facility
Library, museum and civic learning facility
Work
Owner-side MSI and Division 25 coordination
Size
80,000 sq ft · planned building

SLA reviewed the Division 25 design and energy information requirements for the planned library and museum. The owner’s review addressed what the system must deliver, what counts as an acceptable result and which team is responsible for testing and turnover.

Hayward Fire Training Center*

Hayward, California

Building / facility
Fire station and emergency-response training campus
Work
Commissioning
Size
Approximately 64,500 sq ft · nine project structures

Cx experience for the Fire Training Center and Fire Station 6 project in Hayward. The campus combines an active fire station, classrooms, training towers and practical emergency-response training facilities.

LEED Silver

Fire Station 6 and Regional Fire Training Center project.

See the Fire Training Center’s LEED Silver rating

Palo Alto Public Safety*

Palo Alto, California

Building / facility
Public-safety facility
Work
Commissioning

Commissioning experience for the Palo Alto Public Safety project in California.

OCTA Transit Security and Operations Center*

Anaheim, California

Building / facility
Transit security and operations center
Work
Commissioning
Size
32,000 sq ft · facility

Cx Authority

Cx Authority for the facility supporting transit security, dispatch and operations in Anaheim. The assignment addressed the building’s defined Cx scope for those operational functions.

South Sound 911*

Tacoma, Washington

Building / facility
Public-safety communications and emergency operations center
Work
MEP commissioning design review
Size
74,528 sq ft · public-safety facility

MEP Cx design review for South Sound 911’s Public Safety Communications Center. The facility consolidates emergency communications and supporting operations in Tacoma.

Gila River Indian Community District 3 Multipurpose Building*

Sacaton, Arizona

Building / facility
Community multipurpose building
Work
Commissioning agent
Size
45,000 sq ft · community building

Fundamental and enhanced Cx responsibilities included owner-requirements documentation, design and operating-sequence review, readiness and installation verification, training coordination and post-occupancy M&V planning.

Huhugam Heritage Center*

Chandler, Arizona

Building / facility
Cultural museum
Work
MEP assessment and recommissioning
Size
40,436 sq ft · heritage center building

MEP assessment and recommissioning for the Gila River Indian Community museum.

Santa Barbara Museum of Art*

Santa Barbara, California

Building / facility
Art museum
Work
Design-phase Cx participant

Design-phase Cx for the museum project.

Rocky Mountain Arsenal Administration Building*

Commerce City, Colorado

Building / facility
Federal administration building
Work
Commissioning

Commissioning experience for the administration building at Rocky Mountain Arsenal in Commerce City, Colorado.

NAVFAC facility assignments*

Multiple U.S. installations

Building / facility
Federal and military facilities
Work
Federal-facility Cx

Federal-facility Cx assignments at Point Mugu, China Lake, 21 Area ACCR at Camp Pendleton, New River and PAX-River.

Asotin County Justice Center*

Clarkston, Washington

Building / facility
Justice center
Work
Commissioning
Size
48,000 sq ft · proposed facility in the 2021 environmental filing

Commissioning-related experience for the Asotin County Justice Center in Clarkston, Washington.

Grant County Jail*

Ephrata, Washington

Building / facility
Jail / justice facility
Work
Commissioning

Commissioning-related experience for Grant County Jail in Ephrata, Washington.

Southwest Florida International Airport*

Fort Myers, Florida

Building / facility
Airport terminal expansion
Work
Commissioning
Size
164,000 sq ft · terminal project phase

Cx Authority

Fundamental Cx for terminal expansion and improvement work at Southwest Florida International Airport, including the defined terminal and support-facility scope.

Miami International Airport MDAD Administration Building*

Miami, Florida

Building / facility
Airport administration building
Work
Airport-building Cx

Commissioning experience for the airport’s MDAD Administration Building.

Miami International Airport Checked Bag Inspection System Building*

Miami, Florida

Building / facility
Airport baggage-inspection facility
Work
Cx project leadership and completion coordination
Size
77,000 sq ft · baggage-inspection building

Principal-in-Charge during final stages

As principal-in-charge during the final stages of Cx, Marcus coordinated the remaining work where the baggage-inspection addition tied into the existing terminal.

Industrial, semiconductor & utility facilities 24 examples

SLA PROJECT WORK

ASU Tempe Central Plant: transformer and switchgear replacement

Tempe, Arizona

Building / facility
Campus central plant / electrical infrastructure
Work
Electrical Cx

SLA reviews transformer and switchgear specifications and submittals and coordinates testing for the phased replacement. The Cx work addresses how the electrical systems connect, how the metering will be verified and what records the plant team needs at turnover.

SLA PROJECT WORK

ASU Tempe District Utility Plant

Tempe, Arizona

Building / facility
District utility plant
Work
Controls integration, QA/QC and operating readiness

SLA helps the project team trace signals across controls interfaces and clarify who is responsible for each device. Field-readiness reviews address what still needs a QA/QC check and what operating information the plant team needs at handoff.

SLA PROJECT WORK

Chevron: Division 25 and energy metering

U.S. facility program

Building / facility
Facility automation and metering program
Work
Controls-document review and metering-integration oversight

Development and owner review of Division 25 and energy-metering lifecycle frameworks through SLA’s engagement with Sodexo. The work defines system responsibilities, point identity, data validation and operating-handoff requirements.

SLA PROJECT WORK

NTT Phoenix PH3 Data Center

Mesa, Arizona

Building / facility
Data center
Work
Generator and UPS integrated-testing support
Size
235,550 sq ft · building shell

SLA provided oversight of integrated testing through Apollo, focused on generator and UPS operating scenarios and test evidence.

Commissioning leadership across U.S. data centers*

United States · Multiple owners and locations

Building / facility
Data centers
Work
National portfolio oversight

Before joining Streamline Automation, Marcus Myers served as Global Discipline Lead for Commissioning and Energy Auditing at an international architecture and engineering firm. He oversaw commissioning teams serving multiple data center owners across the United States.

Marcus brings that experience to his work as an early contributor and voting member on proposed ASHRAE Guideline 1.6P, which addresses commissioning the power, cooling and controls that keep data centers operating.

American Samoa Power Authority*

Pago Pago, American Samoa

Building / facility
Power utility
Work
Commissioning

Cx experience for American Samoa Power Authority in Pago Pago.

CDWWTP New Materials Building*

Miami, Florida

Building / facility
Wastewater-plant warehouse and materials-management building
Work
LEED-related commissioning

LEED-related Cx work for the new materials-management building at the Central District Wastewater Treatment Plant. The building provides storage and warehouse functions supporting plant operations.

Versum Materials cooling plant*

8555 S. River Parkway, Tempe, Arizona

Building / facility
Industrial cooling plant
Work
Commissioning leadership

Principal-in-Charge

Cx of chillers, cooling towers, condenser-water systems, hydronic pumps, BAS, testing and balancing, and variable-frequency drives. The scope connected planning and review with readiness, functional testing, issues documentation, training and operating-handoff responsibilities.

EMD Electronics, Chandler*

Chandler, Arizona

Building / facility
Cleanroom and manufacturing facility
Work
Cx Authority and project manager
Size
74,970 sq ft · facility scope

Cx of cleanroom and production-support systems within an existing manufacturing facility, including readiness checklists, functional tests, TAB review and issue documentation. The Cx assignment concluded in March 2024.

GlobalWafers, Sherman*

Sherman, Texas

Building / facility
Silicon-wafer fabrication and central utility plant
Work
Commissioning of process utilities and building systems
Size
Approximately 1.2 million sq ft · fabrication project

Cx involvement in the silicon-wafer fabrication and central-utility-plant project, including process utilities, electrical distribution, water systems and BAS/SCADA coordination.

Baxter Healthcare manufacturing plant*

Cleveland, Mississippi

Building / facility
Healthcare manufacturing plant
Work
Commissioning leadership
Size
Approximately 1 million sq ft · manufacturing plant

Cx Principal-in-Charge

Project-level Cx leadership for audit, retrofit and optimization work at the Cleveland, Mississippi manufacturing plant. The technical scope included wastewater, steam, electrical and manufacturing-support systems.

Chevron Briarpark boiler project*

Houston, Texas

Building / facility
Technology-center boiler plant
Work
Boiler commissioning

Cx work for the boiler project at Chevron’s Briarpark Technology Center. The assignment addressed plant equipment serving an existing research and corporate facility.

Chevron Briarpark large-generator replacement*

Houston, Texas

Building / facility
Technology-center electrical infrastructure
Work
Generator-replacement commissioning

Cx experience for the large-generator replacement at Chevron’s Briarpark Technology Center, separate from the site’s boiler assignment.

Chevron Midland UPS and generator replacement*

Midland, Texas

Building / facility
Corporate facility electrical infrastructure
Work
UPS and generator-replacement commissioning

Cx experience for replacement of uninterruptible power supply and generator equipment at Chevron’s Midland facility.

SLA PROJECT WORK

ASU Central Plant controls, SCADA and boiler upgrades

Tempe, Arizona

Building / facility
University central utility plant
Work
Controls upgrades, instrumentation and EIS support

Controls and SCADA migration for ASU’s Central Plant, with instrumentation replacement, servicing and configuration. Related assignments include boiler controls upgrades and Central Plant Energy Information System support.

SLA PROJECT WORK

ASU North Plant controls

Tempe, Arizona

Building / facility
University chiller plant
Work
Plant controls

Controls work for ASU’s North Plant, supporting the operation of campus cooling infrastructure.

SLA PROJECT WORK

ASU Polytechnic chiller plants 1–3

Mesa, Arizona

Building / facility
University chiller plants
Work
Chiller-plant controls

Controls and electrical project work for three chiller plants on ASU’s Polytechnic campus.

Mike Valdez · PROJECT EXPERIENCE

Pinto Valley restart

Globe–Miami mining district, Arizona

Building / facility
Copper mine and processing plant
Work
Controls and electrical restart work

Controls and electrical project work supporting the restart of the Pinto Valley mining operation.

SLA PROJECT WORK

Microchip Technology fab and subfab equipment

Tempe, Arizona

Building / facility
Semiconductor fabrication and process-support facilities
Work
Equipment controls, programming and field service

Field service and controls programming for slurry, chemical and fabrication equipment. Assignments included upgrades to fab and subfab equipment and the process systems that support semiconductor manufacturing.

SLA PROJECT WORK

CRI manufacturing plant

Surprise, Arizona

Building / facility
Industrial manufacturing plant
Work
Plant controls maintenance

Plant controls maintenance for CRI’s Surprise manufacturing operation.

Mike Valdez · PROJECT EXPERIENCE

SeaCa Plastic Packaging extrusion line

Surprise, Arizona

Building / facility
Plastic packaging manufacturing plant
Work
Extrusion controls upgrades and SCADA

Extrusion-line upgrades and a new SCADA system for the Surprise manufacturing facility.

Mike Valdez · PROJECT EXPERIENCE

Postal distribution centers

Columbus, Ohio

Building / facility
Postal distribution facilities
Work
Controls and electrical project work

Controls and electrical assignments for postal distribution facilities in Columbus.

SLA PROJECT WORK

Wm. T. Burnett process equipment

Phoenix, Arizona

Building / facility
Nonwoven textile manufacturing plant
Work
Controls engineering, upgrades and equipment maintenance

At the Phoenix nonwovens plant, SLA’s controls engineering, upgrades and maintenance covered a two-story oven and the machinery that cards textile fibers.

SLA PROJECT WORK

Roche / Ventana Medical Systems

Tucson, Arizona

Building / facility
Cancer-diagnostics reagent manufacturing facility
Work
Process-system upgrades and automation support

Upgrades to Large Bottle Systems used in cancer-screening reagent formulation, with reverse-osmosis/deionized-water system work and support for filling stations and waste-management systems.

Energy, condition & enclosure assessments 14 examples

Cooper University Hospital*

Camden, New Jersey

Building / facility
Hospital parking-garage and tunnel connections
Work
Envelope consultant

The enclosure review focused on where the parking-garage elevator assemblies connect to the main hospital tunnel entrance. This is the point where exterior construction meets the hospital interior.

Penn Medicine Cherry Hill*

Cherry Hill, New Jersey

Building / facility
Outpatient healthcare facility
Work
Building-envelope consultant

The building-envelope consultant combined inspections, destructive investigation and field testing below grade. That let the team assess concealed parts of the outpatient facility’s enclosure that a surface inspection could not show.

George Eastman Museum*

Rochester, New York

Building / facility
Museum
Work
MEP and building-envelope consultant

MEP and building-envelope consulting, including full-building assessment and modeling analysis for the museum.

Getty property, 28655 Braxton Avenue*

Valencia, California

Building / facility
Facility property
Work
Facility condition assessment

Facility condition assessment of the Getty property in Valencia, California.

I-25 Studios*

Albuquerque, New Mexico

Building / facility
Film and television studio campus
Work
Facility condition assessment
Size
500,000 sq ft · studio campus

Facility condition assessment of the studio property in Albuquerque, New Mexico.

Sunrise of Boulder*

Boulder, Colorado

Building / facility
Assisted-living facility
Work
Level 2 energy audit

Level 2 energy audit of the assisted-living facility in Boulder, Colorado.

Air Canada hangar and offices*

Richmond / Vancouver, British Columbia

Building / facility
Aviation hangar and offices
Work
Level 2 energy audit
Size
251,876 sq ft · hangar
182,986 sq ft · main office building

At Air Canada’s Richmond property, the Level 2 energy audit covered both the 251,876-square-foot aircraft hangar and the 182,986-square-foot main office building.

Tesla U.S. facility audits*

United States

Building / facility
Automotive company facilities
Work
Portfolio energy audits
Size
Approximately 7 million sq ft · U.S. audit portfolio

Energy audits and assessments for Tesla facilities across the United States.

Nationwide data center and office audit portfolio*

United States

Building / facility
Data centers and offices
Work
Portfolio energy audits
Size
Approximately 3.5 million sq ft · audit portfolio

Marcus Myers led all 22 site energy audits of older data centers and offices across the United States in 2023.

Turner & Townsend U.S. facility audits*

United States

Building / facility
Multiple facility types
Work
Portfolio energy audits

Energy-audit assignments involving multiple facilities across the United States.

ASU existing-facility assessments and audits*

Multiple ASU campuses, Arizona

Building / facility
University campus buildings
Work
Facility assessments, energy audits and commissioning

Commissioning and energy consultant

Facility condition assessments, energy audits, energy analysis and Cx across ASU campuses. Assignments span academic, laboratory, housing and plant facilities, connecting existing conditions with maintenance and operating needs.

U.S. property condition assessments*

United States

Building / facility
Commercial and institutional properties
Work
Property condition assessment

Property condition assessments across commercial and institutional properties in the United States.

GSA atrium study*

Phoenix, Arizona

Building / facility
Federal courthouse atrium
Work
Atrium and enclosure assessment
Size
571,000 sq ft · courthouse building; assignment focused on the atrium

Atrium study for the Sandra Day O’Connor U.S. Courthouse. The work included site review and coordination of the investigation scope for the existing courthouse atrium.

U.S. Appraisers Federal Building*

San Francisco, California

Building / facility
Historic federal office building
Work
Water-intrusion investigation and technical report
Size
Approximately 434,000 rentable sq ft · building; assignment focused on water intrusion

Water-intrusion investigation and technical-report work for the U.S. Appraisers Building at 630 Sansome Street. The existing federal office building is listed in the National Register of Historic Places.

Energy programs & research 8 examples

Mohawk College emissions-reduction roadmap*

Hamilton, Ontario, Canada

Building / facility
College campus
Work
Energy and carbon planning

Work on the college’s greenhouse-gas emissions-reduction roadmap in Hamilton, Ontario.

ASU carbon-neutrality and energy program*

Multiple ASU campuses, Arizona

Building / facility
University campus and central plants
Work
Energy analysis, controls due diligence and carbon planning

Project Development Engineer and consultant

Developed energy and carbon-reduction opportunities for ASU, with lead roles in controls and pumping due diligence and supporting roles in selected-building assessments and student/research engagement. The work also included ESPC opportunities and central-plant/CHP optimization analysis.

Energize Phoenix*

Phoenix, Arizona

Building / facility
Commercial and institutional buildings
Work
Energy audits, modeling, retrofit analysis and M&V

Commercial-building audits, energy modeling, retrofit analysis and measurement and verification in the 2011–2013 program. Work included HVAC life-cycle and payback analysis for ASU Mercado properties and coordination of energy-efficient lighting installations at other sites.

CERL / Department of Defense building-energy research*

Tempe, Arizona · ASU research program

Building / facility
Military housing, clinics and offices
Work
Building-energy research and modeling

ASU-based research supported by CERL and the Department of Defense. Work included energy modeling, site and data review, lighting analysis and building-attribute matrices for military housing, clinic and office facility types.

ASU Architecture Building North solar laboratory*

Tempe, Arizona

Building / facility
University solar laboratory
Work
Solar-energy research and laboratory management

Managed laboratory and teaching activities involving experimental test-cell design and fabrication, solar-thermal collection, dual-axis solar tracking and graduate research support.

Hennepin County building-systems decarbonization*

Minneapolis and Hennepin County, Minnesota

Building / facility
County building portfolio
Work
Energy analysis and decarbonization planning
Size
More than 6 million sq ft · county portfolio studied

Global Discipline Lead

Building-system decarbonization study covering 77 county properties. The work evaluated energy conservation, electrification, fuel switching and renewable-energy options, with property-level solar feasibility, infrastructure constraints and life-cycle cost review.

University of Windsor carbon-neutral masterplan*

Windsor, Ontario, Canada

Building / facility
University campus and district energy system
Work
Energy benchmarking and carbon-neutral planning

Global Discipline Lead

Campus energy and greenhouse-gas analysis covering more than 50 buildings and their district energy system. The team compared conservation, energy-transition and hybrid pathways using site reviews, utility data, heating and cooling plant analysis, and life-cycle financial assessment.

Minnesota Valley Transit Authority sustainability plan*

Burnsville and the Twin Cities south metro, Minnesota

Building / facility
Transit facilities and fleet portfolio
Work
Energy and emissions benchmarking; electrification assessment

Global Discipline Lead

Energy and greenhouse-gas benchmarking for facilities and fleet, with infrastructure assessment and electrification planning. The work connected mechanical, electrical, plumbing and structural conditions with transition options, performance indicators and a sustainability implementation plan.

* Experience gained with previous firms, including project delivery and leadership roles.

WHAT YOUR TEAM TAKES FORWARD

Findings you can use.
Records you can follow.

The value of the work is what it helps your team decide. Connect the agreed requirements with observed conditions, test results, responsible parties and the next action.

Read the field note on sharing technical knowledge →

A clear basis.

The systems, interfaces, operating requirements and acceptance criteria included in the assignment.

A traceable finding.

The observation or result, the equipment it concerns, its operating context and the supporting record.

An actionable handoff.

Completed work, open issues, assigned follow-up and the information the receiving team needs.

Explore an operating-information demonstration →

THE PEOPLE BEHIND THE EXPERIENCE

Talk with Mike
and Marcus.

Tell us which system or milestone matters to you. We’ll point you to a comparable assignment and explain where our team can help.

Let’s connect →Explore their backgrounds →

SEE WHAT SLA CAN DO.