Preparing for testing
Identify the systems, completed checks, open conditions, procedures, people and permissions needed for the planned verification. Give each missing prerequisite an owner and next action.
ServicesReadiness & QA/QC
READINESS & QA/QC
Before a test or handoff, your team needs to know what is installed, what has been checked and who can release the next step. We bring the trades and operators together to answer those questions.
Choose a check. See what supports the decision.
Define the milestone, system boundary and required result. Link the criteria to the applicable design, owner requirements and agreed scope.
What your team receivesA readiness checklist tied to the requirement and planned verification.
Bring together installation and startup records, point checks, current procedures, access, support and unresolved conditions relevant to the planned work.
What your team receivesA visible dependency list with the missing item, its effect and the next action.
Name the people who prepare, perform, correct, verify and receive the work. Identify who can authorize the next activity and who must support it.
What your team receivesAssigned responsibilities and an acknowledged handoff for each interface.
Connect the requirement to the actual record, finding, correction and verification. Keep unresolved items visible so the decision reflects the available evidence.
What your team receivesA readiness recommendation with supporting records, limitations and open actions.
FIELD READINESS
A transfer pump is installed and its graphic is green. What would convince your operator that water is moving? The answer takes more than one discipline.
Contractor QA/QC checks the installation against the drawings. Industrial automation traces the pump command and its feedback at the PLC. Building controls checks which condition the building is asking for. Master systems integration (MSI) checks that the operator sees the right field point.
Commissioning (Cx) witnesses the agreed test and records the response. Energy compares metered power with the load served. The project scope determines which of these checks you need, who performs them and who can accept the work.
SLA experience. The ASU Tempe District Utility Plant engagement in Tempe, Arizona, brings controls, QA/QC and readiness work together. At NTT Phoenix PH3 in Mesa, Arizona, SLA provided oversight of generator and UPS integrated testing through Apollo.
See the Tempe District Utility Plant project
See the NTT Phoenix PH3 testing assignment
Identify the systems, completed checks, open conditions, procedures, people and permissions needed for the planned verification. Give each missing prerequisite an owner and next action.
Reconcile the current condition with the requirement. Build an issue and action record that distinguishes reported completion from the evidence still needed for verification.
Connect current drawings, configurations, test records, open issues and training needs. Identify the receiving team and the information they need to use and maintain the system.
AN ILLUSTRATIVE PROJECT QUESTION
An incomplete prerequisite can make a test inconclusive or prevent it from proceeding. Identify the dependency early and assign the next action.
See a sample finding from observation to verificationAgree on the system, operating mode, test objective and criteria.
Check installation, startup, instrumentation, controls and open conditions relevant to the test.
The authorized parties determine release, restrictions or deferral. Preserve the decision and supporting evidence.