INTERFACES / HANDOFFS / MILESTONES
Your project moves forward when the next team has what it needs. SLA helps connect design decisions, trade and vendor scopes, installed systems, verification and the people who will operate them.
Explore what changes at each handoff ↓THE CONNECTION IS TECHNICAL AND HUMAN
A utility connection, a controls point, a vendor package and a turnover record all cross boundaries. Agree who provides the work, who verifies it, who can accept it and what the receiving team needs before its next activity.
Install, configure and supply the required records.
Check the condition, witness the response and retain evidence.
The designated authority decides whether the next activity may proceed.
The next team understands the system and owns the remaining actions.
FOLLOW THE WORK THROUGH THE PROJECT
Select a touchpoint. See the people, evidence and next activity it connects.
OWNER → DESIGN & DELIVERY TEAM
Bring owners, designers, operators and delivery leads together early. Define the operating need, boundaries, measurable criteria and decisions that other teams depend on.
Agreed requirements, system boundaries, decision owners and a verification basis that can flow into design and procurement.
New Construction Cx scope →MILESTONES & THE CRITICAL PATH
Equipment startup depends on more than installation completion. Trace the prerequisites and review their effect on the current project schedule.
NEXT MILESTONE / EQUIPMENT STARTUP
Identify the missing utility evidence, the responsible party and the receiving team. Agree the correction or verification needed before recommending the next activity.
WHAT SLA BRINGS TO YOUR TEAM
Define equipment and system boundaries, vendor packages, utility connections, points of responsibility and acceptance criteria.
Coordinate prerequisites, factory tests, startup, witnesses, resources and correction/retest time with the master schedule.
Connect instruments, panels, PLC/BAS logic, networks and SCADA to the physical response and operator information.
Connect inspection records and startup checks with functional and integrated test evidence. Keep execution, correction and independent verification roles clear.
Show the system status, evidence, open decisions and next actions. Review blockers against driving and near-critical paths, then update the forecast.
Involve operators early. Connect task demonstrations, current sequences, recoverable backups and outstanding responsibilities to the turnover.
Scope and responsibilities are agreed for each assignment. SLA coordinates its work with the owner, designers, construction team, vendors and specialist testing agencies. The designated authorities retain release and acceptance decisions.
START WITH THE NEXT HANDOFF
Bring the milestone, the system boundary and the conditions still unresolved. We can help define the work and the right people to carry it through.