StreamlineAutomation

Total building CxMechanical and process utilities guide

STREAMLINE AUTOMATION / SLA360

Cooling, utilities and operating conditions.

Running equipment is only one part of the evidence. Verify what the facility, room or receiving equipment actually receives.

MECHANICAL Cx & UTILITY VERIFICATION

Verify cooling and
utility performance.

SLA helps the team verify that mechanical systems deliver the temperature, flow, pressure and operating response required at the space, process or equipment they serve. The Cx plan connects installation and startup prerequisites, TAB and specialist evidence, approved sequences, and functional or integrated testing.

For the agreed scope, the owner receives readiness records, witnessed results, interface findings and correction/retest status, with remaining restrictions and follow-up responsibilities carried into operating handoff.

See the plant example and its operating information →

01

Cooling plants & distribution

Chillers, towers, pumps, VFDs and heat exchangers. Follow flow, temperature, pressure, valves and staging.

Evidence carried forward

Delivered cooling and recovery under the agreed operating conditions.

02

Critical IT cooling

CRAC/CRAH, fan walls, containment and scoped liquid-cooling interfaces, coordinated with the OEM.

Evidence carried forward

Air or fluid conditions, alarms, leakage response and recovery evidence.

03

Cleanroom environment

Make-up and recirculation air, FFUs, pressure relationships, temperature/RH and specialist cleanliness evidence.

Evidence carried forward

The operating state, measurement location and environmental acceptance limits.

04

Process utilities & tool boundaries

UPW/RO-DI, process cooling, CDA, nitrogen and vacuum. Coordinate gas, chemical, exhaust and treatment interfaces with specialists.

Evidence carried forward

Delivered conditions at the agreed receiving boundary, with clear acceptance responsibilities.

Qualified and authorized providers perform specialist testing, equipment operation and isolations under the approved project plan. Coordinate the scope with the owner, designers, trades, OEMs and designated acceptance authority.

TALK WITH SLA

Define the system and receiving boundary.

Bring the operating requirement, utility interfaces and conditions that need to be demonstrated.

Discuss the scope →

SEE WHAT SLA CAN DO.

Enlarged technical illustration

Illustrative only. No live system connection.