Cx / commissioning
A process connecting requirements, verification and documented operating response across the project lifecycle. The project scope establishes systems, activities and acceptance criteria.
QA/QC
Quality assurance and quality control. The first establishes the process; the second checks work against requirements. Define responsibilities and evidence in the scope.
MSI / master systems integration
Coordination of systems, interfaces and owner information across platforms. Connecting a network alone does not establish usable or verified information.
Division 25
The part of the project specifications that tells vendors how their systems must work together. SLA can help an owner write the point, naming and testing requirements before bids go out, then trace a sample point from the equipment to the operator’s screen. See what goes into Division 25.
BAS / BMS
Building automation or building management system. These systems monitor and control building equipment within their configured scope.
PLC / SCADA / HMI
Programmable logic controller, supervisory control and data acquisition, and human-machine interface. They serve different roles in control, supervision and operator interaction.
OPR / BOD
Owner’s Project Requirements and Basis of Design. These connect the owner’s needs with the design approach and provide a basis for coordination and verification.
Point-to-point verification
Checking that a defined field point and its associated control or monitoring representation correspond as intended. Functional testing addresses broader system response.
Readiness
The documented prerequisites for a defined activity. A readiness discussion is not authorization for switching, energized work or operation.
Retest
A subsequent verification after correction or a changed condition. The record should identify the procedure, conditions, result and remaining limitations.
Definitions help.
Agreed scope matters.
Use the project documents to establish exact requirements, roles and acceptance criteria.