Existing-building commissioning · Phoenix, Arizona
ASU Mercado Buildings B and C
ASU renovated the rooms and kept the older rooftop units. Marcus worked with Facilities and the trades to check whether the online controls matched what the equipment did for the people in those rooms.
What the renovation kept
The renovation’s Cx scope included 14 rooftop units. The team needed a broader picture of the existing equipment before it could interpret the airflow tests or the controls. SLA developed inspection and checkout sheets using maintenance principles from ASHRAE Standard 180. Tempe Mechanical completed the field records for 22 rooftop units.
SLA reviewed those records alongside the air-balancing reports and Pelican controls information. Where several rooms shared one unit, the team checked which temperature sensors contributed to the average and how heavily each room counted.
What the trend uncovered
An unusual rooftop-unit trend prompted a field check. Tempe Mechanical identified a thermostat configured for the wrong equipment type. ASU technicians corrected the thermostat wiring. Gilbane then reported that the unit was operating and trending as intended.
What Facilities could use
SLA prepared two documents for ASU and Gilbane. The executive report summarized the findings, their disposition and the work passing to maintenance. The indexed field record connected those conclusions to equipment checklists, air-balancing reports, controls screenshots and service records. An operator investigating a recurring complaint could go back to the unit and see what had been checked.