Choose the right investigation. Make a better energy decision.
Are you screening a portfolio, choosing which upgrades to fund or deciding whether to replace a plant? We match the depth of the audit to that decision and show your team the assumptions behind each estimate.
START WITH YOUR QUESTION
How much analysis does your decision need?
Select a level to see its purpose. Each level builds on the previous work. An audit represented as an ASHRAE level must meet the applicable Standard 211 procedures, minimum analysis and reporting requirements. Agree the applicable edition and project scope before starting.
LEVEL 1 / WALK-THROUGH SURVEY
Where should we look more closely?
Review historical energy use and costs, benchmark the building, interview operators and walk the facility to identify low-cost or no-cost measures and capital opportunities for further study.
Decision support:An energy-use overview, preliminary measure costs and savings, and priorities for further investigation.
Useful for screening. It does not provide detailed design or proof of achieved savings.
An agreed workplan, data request and responsibilities.
02Collect and check the evidence
Review utility bills, interval records, tariffs, equipment information, drawings and sequences. Identify missing periods, meter boundaries and unusual operating conditions.
What you receive
An energy-use baseline with sources, assumptions and data gaps.
03Investigate the building
Walk the systems with operations. Inspect equipment and schedules, review trends and plan measurements around the information gaps.
What you receive
Documented observations, measurements and operating context.
04Develop and test the opportunities
Discuss preliminary measures with the owner. Analyze energy and cost savings estimates, implementation costs, interactions and operating impacts at the agreed audit level. Show the assumptions behind the financial comparison.
What you receive
A prioritized measure register with a traceable technical and economic basis.
05Turn findings into a delivery decision
Review the draft together. Separate operational corrections, capital measures and questions needing more evidence. Define implementation and verification as explicit next scopes.
What you receive
A final report, supporting analysis and a practical action roadmap.
Savings estimates depend on assumptions and operating conditions. Implementation, design, incentives and post-installation measurement are separately defined scope items, not automatic audit inclusions.
Energy-audit experience. Marcus Myers led 22 audits across a national portfolio of older data centers and offices in 2023*. His prior work also includes audits for Tesla*. Explore energy-audit projects
Choose the investigation for the question.
Facility condition assessment (FCA): Review observed equipment and enclosure condition, deferred maintenance and renewal needs. The findings help prioritize investigation, repair and replacement alongside energy improvements.
Property condition assessment (PCA): Support property due diligence through a walk-through, records review and interviews. The property condition report identifies material deficiencies, opinions of repair costs and further investigation needs within the agreed scope. Explore assessment experience →
A PCA describes conditions at the time of the assessment. Where ASTM E2018 is specified, agree the applicable edition, scope and exclusions. Define specialist testing or additional investigation separately.
An energy audit evaluates efficiency opportunities and supports an investment decision. EBCx investigates how the systems operate against current requirements and verifies agreed corrections. Data Assurance Cx establishes the source and meaning of the analysis inputs. Ongoing Cx maintains review, action and verification after the initial work.
Sunrise of Boulder* · Boulder, Colorado. Level 2 energy audit of an assisted-living facility. Jim Pattison Pavilion* · Vancouver, British Columbia. Healthcare energy audit. Embassy Suites central plant* · Honolulu, Hawaii. Plant assessment followed by retro-Cx.
A controls review, a facility condition assessment and an energy audit serve different purposes. Standard 211 also has defined building and end-use limits. Industrial process studies and other excluded applications need a separately defined approach.