When a chiller, meter or controls package has to report to your campus system, who supplies the connection and who checks what arrives? SLA helps you and your design team write those answers into the Division 25 specifications before vendors price the work.

START WITH THE OWNER’S REQUIREMENTS

Settle the details
that connect the project.

Division 25 is the Integrated Automation division in CSI MasterFormat. It organizes project-specific requirements; the project specifications and adopted owner standards define the required work. SLA helps the owner and design team develop a coordinated scope, then connects it to implementation and verification through master systems integration (MSI).

01 / ARCHITECTURESystem boundaries

Identify the systems, networks and platforms involved. Define the interfaces between BAS/BMS, electrical metering, PLC/SCADA and vendor packages, with each party’s responsibility clear.

02 / INFORMATIONIdentity and meaning

Agree equipment and point naming, units, scaling, metadata, timestamps and quality indicators. A useful value needs enough context to identify its source and interpret its condition.

03 / BEHAVIORExchanges and response

Define required points, alarms, trends, update needs and permitted commands. Document what happens when a source is unavailable and which local control or protective functions remain independent.

04 / ACCESSIT and OT coordination

Coordinate network ownership, access approvals, accounts, remote support and change control with the owner’s IT and operational technology teams. For each network data drop, agree who supplies it, who identifies the switch port serving the equipment and who tests the connection with the owner’s IT team. Carry the approved requirements into the delivery scope.

05 / ACCEPTANCEEvidence before signoff

Set readiness prerequisites, interface checks, test responsibilities and acceptance criteria. Record what was demonstrated, what failed, who owns the correction and which conditions remain open.

06 / CONTINUITYA maintainable handoff

Define the required configurations, backups, mapping records, licenses, training and operating information. Agree who maintains the connections and updates the records after turnover.

REQUIREMENTS THROUGH DELIVERY

Keep the responsibility
with the requirement.

The specification sets the obligation. MSI coordinates the agreed interfaces. Cx verifies the defined performance and documents the result. Establish these roles early, including who can approve a change or accept an unresolved condition.

Define and coordinate.

Review the owner’s operating goals, existing platforms and project documents. Develop the interface list, responsibility matrix and verification approach with the design and delivery teams.

Useful records: architecture diagrams, requirements register and coordinated scope boundaries.

Implement and verify.

Coordinate submittals, vendor point lists, mapping and access. Trace agreed information from the field source to the receiving system and check the specified behavior with the responsible parties.

Useful records: interface check sheets, issue logs, test results and correction records.

Transfer and maintain.

Review the agreed handoff information with operators. Identify remaining conditions, ownership of each connection and the process for updating configurations and supporting records.

Useful records: accepted mappings, backups, operating instructions and an open-items register.

SLA EXPERIENCE / CHEVRON THROUGH SODEXO

Division 25 and metering.
Requirements the owner can carry forward.

SLA’s Chevron engagement includes controls-document review and the HOU140 metering-integration oversight and verification assignment. Marcus has developed Division 25 and energy-metering lifecycle frameworks for owner review, connecting the specification to the information and evidence the facilities team needs.

Coordinate the requirements.

Connect equipment controls with enterprise integration, naming, metadata and vendor responsibilities. Record the owner decisions needed to align existing standards with the proposed framework.

Make the meter traceable.

Define the meter-to-platform mapping, point-to-point checks, units, scaling, timestamps and data-quality evidence. Tie the verification plan to the installed measurement and its intended operating use.

Plan for the lifecycle.

Carry configuration records, ownership, handoff information and change control into continued operation. Keep the supporting records connected as meters, platforms and responsibilities change.

The frameworks are prepared for owner validation and adoption. Live meter verification and final acceptance are distinct field and closeout milestones within the assignment.

Chevron laboratory (facility name withheld)* · Houston area, Texas. Marcus helped start the project and coordinated Division 25 interfaces and Cx test planning during his time with the team.

SLA EXPERIENCE / ARIZONA STATE UNIVERSITY

Requirements that follow
the data into operation.

Current SLA assignments at the John S. McCain III Library and Museum, ASU Health headquarters and Bateman Physical Sciences Center H Wing connect owner-side MSI and Division 25 requirements with controls, EIS metering and operating-data readiness.

Assign the responsibilities.

Connect system interfaces, vendor deliverables and a responsibility matrix with project milestones. Define who prepares, checks and accepts each part of the handoff.

Keep the point understandable.

Review BAS naming, GSA-based conventions, metadata and equipment relationships so source-system information can be interpreted in the owner’s operating environment.

Define the acceptance evidence.

Connect readiness, meter/submittal review, mapping and verification requirements to the operating use. Keep recommendations and working baselines connected to the owner’s review decisions.

ASU Division 25 requirements* · Arizona State University campuses. Marcus led the team revising the university’s integrated-automation requirements. Current SLA work carries that experience into project responsibilities, data assurance and EIS delivery.

Explore current campus integration assignments

AN EXAMPLE OF A TRACEABLE INTERFACE

One reading.
A complete chain of responsibility.

Consider a building electrical meter feeding the owner’s energy platform. “Provide integration” leaves important decisions unanswered. An agreed interface record makes those decisions visible.

Illustrative scope record / electrical meter → energy platform

Decision to settleWhat the project record should identify
Source and meaningMeter and circuit identity, measurement type, units, scaling, timestamps and the source point.
Delivery responsibilityWho supplies and configures the meter, exposes the value, maps the interface and maintains the receiving platform.
VerificationThe agreed comparison with source records, time alignment, data-quality indication and behavior when communication is lost.
HandoffThe accepted mapping, supporting verification record, configuration backup, remaining conditions and responsible owner.

This is an example for scope discussion. Project-specific documents establish the required accuracy, timing, tests and acceptance limits.

APPLY THE REQUIREMENTS TO THE FACILITY

Different facilities.
Specific integration needs.

A campus needs continuity across buildings. A plant needs reliable process and utility information. A critical facility needs clearly defined interfaces and operating boundaries. Build the requirements around the actual facility and the people who will operate it.

Use the owner’s applicable documents.

Coordinate Division 25 with controls, electrical, communications and other applicable project divisions, drawings and owner standards. Controls requirements can span several divisions; their location and responsibilities must be defined for the project. Confirm the applicable editions and revisions. See how the University of New Hampshire documents its building automation requirements and control sequences.

LET’S DEFINE THE SCOPE

Bring the systems.
We’ll work through the connections.

Talk with SLA →

* Experience gained with previous firms, including project delivery and leadership roles.

SEE WHAT SLA CAN DO.

Enlarged technical illustration

Illustrative only. No live system connection.