DATA CENTERS
Power, cooling and controls.
One operating response.
A power transfer puts more than the electrical system to the test. We work with your electrical, mechanical and controls teams to check what the load experienced and whether cooling and controls recovered as intended.

Need Cx and controls technicians on site?
Streamline Automation (SLA) can put Cx and controls technicians alongside your electrical, mechanical and operations teams. On day one, that can mean checking whether the generator and UPS systems are ready for integrated testing, tracing a controls point from the equipment to the operator’s screen, or documenting the issue holding up the next test so the right trade can act.
Tell us where the job is, when you need people and what’s coming up on the schedule. We’ll tell you who’s available, how quickly we can mobilize and what work we can take on.
Talk to us about field supportTHE WORK & ITS PURPOSE
Plan for transfer,
failure and recovery.
Coordinate power, cooling and controls around the load, operating modes, failure scenarios and recovery requirements the facility must demonstrate.
- Electrical and mechanical Cx coordination
- Cooling-system sequences, permissives and recovery
- Controls, monitoring and operator information
- Functional and integrated-system test planning
DATA CENTER COMMISSIONING
What does each level prove?
SLA helps owners define the tests, review the evidence and decide what is ready to move forward. The owner’s Cx plan sets the boundaries and assigns release authority for each stage.
L0 · Planning and design
Agree on the operating requirements, responsibilities and acceptance criteria before equipment is ordered.
L1 · Factory verification
Compare factory test results with the approved equipment requirements and record open items before shipment.
L2 · Delivery and installation
Check delivered equipment against the factory record and verify installation and startup prerequisites.
L3 · Startup
Document initial operation, settings and outstanding issues before releasing the equipment for functional testing.
L4 · Functional performance
Test each system against its sequence and record the expected and observed response.
L5 · Integrated systems testing
During a power transfer, verify cooling, controls power, communications, permissives and alarms through recovery.
At handoff, review results with operators, confirm training and assign owners to open items. Energization and switching remain with the qualified parties authorized for the project.
PROJECT EXPERIENCE
Power continuity.
Operating performance.
NTT Phoenix PH3 Data Center · Mesa, Arizona. SLA provided oversight of generator and UPS integrated testing through Apollo, supporting verification of the facility’s electrical response.
Nationwide data center and office portfolio* · United States. Marcus Myers led all 22 site energy audits in 2023, assessing equipment condition, operating requirements and energy use across older data centers and offices.
National portfolio oversight. Before joining Streamline Automation, Marcus Myers served as Global Discipline Lead for Commissioning and Energy Auditing at an international architecture and engineering firm. He oversaw commissioning teams serving multiple data center owners across the United States.
ASHRAE Guideline 1.6P. Marcus brings that experience to his work as an early contributor and voting member on proposed ASHRAE Guideline 1.6P, which addresses commissioning the power, cooling and controls that keep data centers operating.
WHERE THE WORK CONNECTS
Services for this work.
LET’S CONNECT
Tell us your next testing milestone and where you need field support.