StreamlineAutomation

CONTROLS

Building controls.
BAS and DDC.

When a room warms above its cooling setpoint, the wall sensor reports the temperature to the local direct digital controller (DDC). The controller commands the VAV damper to open. We check the measured airflow on the building automation system (BAS).

See where building and process controls meet

Looking for a PLC panel build?

Wall sensor reading 74°F and 45% relative humidity beside a variable air volume controller and its opening damper.
In this cooling-only VAV example, the room is 74°F against a 72°F cooling setpoint. The controller calls for more air. Does the measured airflow rise?In this example the room is 2°F above setpoint. The VAV box measures 420 cfm against a 500 cfm airflow target.

BAS points for this room

Illustrative readings for a cooling-only, pressure-independent, single-duct VAV box.

Room and cooling target

Room temperature
74°F
Effective cooling setpoint
72°F
Room relative humidity
45%

VAV box

Airflow setpoint
500 cfm
Measured airflow
420 cfm
Damper command
65% open
Actual damper position
No feedback sensor
Box discharge-air temperature
56°F

Building system

VAV controller communications
Online
Air handler supply-air temperature
55°F
Outdoor air temperature
90°F
Outdoor relative humidity
30%

Field check. If measured airflow stays at 420 cfm against the 500 cfm setpoint, verify airflow in the field and check damper travel and available duct pressure.

CONTROLS WORK IN THE FIELD

Controls delivery,
from design to handoff.

SLA plans and delivers controls work around the equipment, the approved operating sequence and the people who will maintain it. The assignment defines design responsibility, installation limits, access and who authorizes changes.

  1. Plan and design: coordinate BAS architecture, sensors, actuators, network interfaces and equipment sequences within the agreed design scope.
  2. Check field devices: match sensors and actuators to their BAS points, check scaling and compare readings with conditions at the equipment.
  3. Program and configure: program direct digital control (DDC) sequences for air handlers, terminal units and pumps. Set up BAS graphics, schedules, alarms and trends. Keep programs and settings traceable to the approved requirements.
  4. Start up and troubleshoot: support authorized startup, check points and system response, investigate faults and document approved corrections with the responsible field and equipment teams. For a damper check, compare the open command with position feedback when available and observe the blades in the field to confirm they move as expected.
  5. Hand over and support: provide the agreed programs, configurations, drawings and check records, explain operation and recovery with the receiving team, and identify remaining work.

Lighting controls: verify zones, sensors and schedules

Controls and industrial experience

When the process needs the building

Suppose a process skid needs exhaust before it can start. The exhaust fan reports that it is running. Building controls check whether air is actually moving. The skid uses that signal to decide whether it can run. During commissioning, we check what each operator sees if the airflow falls or the signal goes stale.

A building automation system can use programmable logic controllers (PLCs), dedicated direct digital controllers (DDC), or a mix. We compare what must keep running, how quickly it must respond and what your team can maintain.

Follow the signal to the process skid

FOLLOW THE SIGNAL

010203

Start at the source.

A temperature reading can look reasonable even when its identity or units are wrong. Confirm the instrument, location, range and point record before relying on the value.

Illustrative relationships. Scope and acceptance evidence are agreed for each project. No connection to live equipment.

WHAT THE TERMS MEAN

Controllers, operator interfaces and building systems.

PLC and DDC
Controllers execute the assigned control logic. PLCs are common in process and plant automation; DDC is common in building systems. A PLC can also run building equipment. The required sequence and the owner’s maintenance needs guide the choice.
HMI and SCADA
An HMI is an operator interface. SCADA brings supervisory functions and operating information together across connected equipment. The screen must represent the equipment and the logic behind it.
BAS
A building automation system coordinates building equipment, schedules, alarms and operating information. Its controllers, interfaces and integration boundaries still need to be defined for the facility.

WHAT YOUR OPERATING TEAM RECEIVES

Programming, graphics
and system records.

Agree which programs, configurations and records form the operating handoff. Each supports a different maintenance or troubleshooting task.

01

Controls architecture

Controller, network, instrument and equipment relationships, with documented interfaces and responsibilities.

02

Programming and operator graphics

Sequences, alarms, point information and operating views coordinated with equipment behavior and project requirements.

03

Backups and handoff records

Agreed configuration backups, field verification records and practical operator explanations for maintenance and future changes.

SERVICE & SUPPORT

Keep the system
maintainable.

For recurring alarms, unreliable points or planned controls changes, define the systems covered, the investigation needed and the support the operating team can expect.

01Agree the engagement

Bring: the equipment and controls platform, the operating concern, available drawings and backups, recent changes and the people responsible for access and approvals.

Define together: the assets and work covered, site constraints, planned visits, support hours, response expectations, authorization for changes and responsibilities for work outside the engagement.

02Plan maintenance and troubleshooting

Use the available alarm history, trends, point records, sequences and service history to identify what needs investigation. Planned maintenance can include agreed reviews of controls records, backups, instrument condition and system behavior.

Work to an agreed plan: separate observations from suspected causes, identify the checks and access needed, and document proposed corrections. Field checks and changes follow the owner's operating restrictions and approval process.

03Set remote access boundaries

Remote review is included only when agreed and supported by the owner's IT/OT policies. Confirm the authorized users, access method, time window, permitted systems and how activity will be recorded.

Make the limit clear: reviewing trends or configurations is different from changing logic, setpoints or equipment operation. The engagement identifies who may approve each action and when an on-site investigation is needed.

04Receive a useful service record

The agreed handoff: a service summary with the reported condition, records reviewed, observations, authorized work completed and the evidence supporting the follow-up decision.

Include relevant configuration or backup records when part of the work, plus open items, responsible parties and recommended next steps. The owner should be able to distinguish what was checked, what changed and what remains unresolved.

Agree the operating limits. Access, testing windows, change controls and response commitments are confirmed for each engagement. Programming changes and field work require the owner’s authorization. Planned support does not imply continuous monitoring or an emergency response commitment.

LET’S CONNECT

Let’s plan your
controls work.

Talk with SLA →

SEE WHAT SLA CAN DO.

Enlarged technical illustration

Illustrative only. No live system connection.