CENTRAL PLANTS & UTILITIES
A central plant runs
on its connections.
When campus cooling demand climbs, do the chillers, pumps and thermal storage respond together? This is where we thrive. Mike traces the controls from the instruments to the equipment. Marcus works with the trades and operators to test the sequence and verify what the plant actually delivers.

THE WORK & ITS PURPOSE
Verify the service
the plant delivers.
A central plant produces the heating and cooling its buildings depend on. We follow that demand through boilers, chillers, pumps and thermal energy storage, then check how the controls respond as the load changes.
- PLC, SCADA, HMI and instrumentation
- Chillers, pumps and thermal-storage interfaces
- Permissives, sequencing and equipment interactions
- Controls field services and operator support
THE WORK IN CONTEXT
The pump is running.
What confirms the flow?
An operating indication needs context. Instrument quality, valve position, system conditions and independent feedback help explain whether the intended result is being achieved.
- Separate command from response
Identify whether “running” means a command, starter status, speed feedback or measured process condition.
- Follow the hydraulic path
Review the expected valve positions, available pressure, instrument condition and connected equipment under the agreed test conditions.
- Record the operating evidence
Compare observed response with the sequence and acceptance criteria. Carry restrictions, corrections and retest status into the operator record.
PROJECT EXPERIENCE
From plant controls
to system verification.

ASU Tempe Central Plant · Tempe, Arizona. SLA electrical Cx for transformer and switchgear replacement, connecting test responsibilities, phased-transition readiness and metering/EIS verification.
Tempe District Utility Plant · Tempe, Arizona. SLA’s work includes controls integration, QA/QC and operating readiness for thermal energy storage. At ASU’s Tempe Central Plant, Mike’s controls work also included SCADA upgrades and field instrumentation. Mike’s wider ASU controls experience includes the Central and North plants in Tempe and Polytechnic chiller plants in Mesa, Arizona, along with boiler upgrades and campus energy-information systems.
Chevron Briarpark* · Houston, Texas. Boiler and large-generator assignments. Chevron Midland* · Midland, Texas. UPS and generator replacement. Versum Materials cooling plant* · Tempe, Arizona. Industrial cooling-plant Cx.
WHERE THE WORK CONNECTS
Services for this work.
LET’S CONNECT
Which plant sequence do your operators need to prove?