StreamlineAutomation

FROM PLANNING THROUGH OPERATION

FROM INSTALLATION
TO INTEGRATION.
FIRST IN. LAST OUT.

SLA 360 means we’re your partner from planning through operation. We connect your systems, verify the data against field measurements, and test the systems together to prove they perform as designed.

We connect your systems and prove they work together in the field.

SLA 360 means we’re your partner from planning through operation. We connect your systems, verify the data against field measurements, and test the systems together to prove they perform as designed.

WHY STREAMLINE / OUR PARTNERSHIP

Mike Valdez and Marcus Myers

TWO PARTNERS.
ONE ACCOUNTABLE TEAM.

“Either of us can take the lead.”

When the question is what’s happening inside the plant, Mike can lead the investigation and Marcus can coordinate the test with the trades. When Marcus leads commissioning, Mike and the controls crew trace the sequence at the equipment. Your operators have a voice from the first question through the retest.

We give our technicians that same opportunity. They lead the next check, explain the result to the operator, and have us beside them when the questions get tough.

01 / Proactive planning

Identify missing information, system interfaces and testing prerequisites early, while your team has time to act.

02 / Clear accountability

Define who owns each action, track open issues and follow corrections through to documented resolution.

03 / Teamwork in the field

Work with owners, designers, contractors and operators to understand the problem and develop practical solutions together.

04 / Verified performance

Compare actual system response with agreed requirements. Document the results, remaining issues and what operators need next.

We want to earn your trust.We’ll tell you the truth and stand behind our work.

When something needs attention, you’ll hear it from us while there’s still time to act. We’ll tell you what we know, show you what still needs checking, and work with your team to get it right.

OUR TEAM

Meet the people
behind the work.

Leadership, office operations and field expertise working together around your project, with a shared commitment to developing our team.

Mike Valdez
CEO & Partner

Mike Valdez

Email Mike →

Mike is Streamline’s founder and a former U.S. Navy Seabee. His 35+ years in controls and automation span semiconductor equipment, production lines and ASU’s central plants. When a plant behaves differently from the operator’s screen, Mike leads the field investigation alongside the people who run it.

Explore Mike’s background →
Marcus Myers
CTO & Partner

Marcus Myers

Email Marcus →

Field and technical leadership across Cx, building enclosure Cx (BECx), QA/QC, controls, integration and energy. Marcus connects construction experience, hands-on investigation and verification with the people delivering the work. He created ASU’s commissioning education program and founded Cx Devils, bringing field practice, teaching and team development together.

CxA · BECxP · CEM · LEED AP BD+C · Assoc. AIA · LFAExplore Marcus’s background →

Career figures reflect individual experience, including prior employers. Team, service and market counts reflect the people and categories shown on this site.

Our services.

Choose a discipline to see what we check in the field, who we work with and what your team receives.

FOCUSED EXPERTISE

Division 25 and enclosure commissioning

INDUSTRIAL AUTOMATION

Inside an industrial control panel.

Follow the work from the enclosure and DIN rail to the PLC, field wiring and operator display.

Field devicesInstrumentation & field services
Control systemsPLC & I/O
Operator informationSCADA & HMI
Panel shopFabrication & checkout
Explore PLC panel fabrication
Illustrative field review: three professionals compare an equipment sensor with a checklist and tablet.

CONTRACTOR QA/QC

Know what’s ready
before the test.

Bring us in before work is concealed or a witnessed test is booked.

We work with the superintendent and trades to check the installation, assign open items and verify corrections so the Cx team knows what it can test.

Explore contractor QA/QC
Prepare together.

Align requirements, responsibilities and testing prerequisites before the next milestone.

Verify in the field.

Review installations and measurements, and witness agreed tests with the responsible teams.

Follow through.

Track issues, verify corrections and connect the results to an informed operating handoff.

ACROSS OUR SERVICESPart of a wider engagement or a separately scoped readiness, recovery or handover review.

Explore the complete SLA service catalog →

THE SLA360 APPROACH

HOW OUR SERVICES
WORK TOGETHER.

The pump says it’s running. Is water moving?

In our transfer-skid simulation, the starter reports a running motor while the outlet flow signal is missing. See how each discipline helps the team decide what to check next.

Watch the pump run

See our central plant work

01 · Design intent

Design intent

Commissioning (Cx)

Translate owner requirements into clear acceptance criteria.

Evidence to ask for
Acceptance criteria stating the required response and how the team will witness it.

Design intent

Building controls

Define how each system should respond and who provides the controls and instruments.

Evidence to ask for
The sequence of operation and its matching points list. Pick one piece of equipment and trace the command, the feedback and the expected response.

Design intent

Systems integration (MSI)

Define system interfaces, data requirements and ownership.

Evidence to ask for
An interface list naming the point source, destination and responsible trade.

Design intent

Energy

Establish performance goals and a useful baseline.

Evidence to ask for
A baseline plan naming the meters, operating conditions and comparison period.

Design intent

Industrial automation

Agree which permissives allow the transfer pump to start and which field signal will prove flow.

Evidence to ask for
A sequence identifying the start conditions and independent flow proof.

Design intent

QA/QC

Plan inspections with the trades. Identify items to check before concealment and evidence required before Cx.

Evidence to ask for
An inspection plan naming the checks due before access is closed.
02 · Field verification

Field verification

Commissioning (Cx)

Review readiness and verify the agreed system response.

Evidence to ask for
A witnessed test record with expected and actual results, open items and retest status.

Field verification

Building controls

Check instruments, programming and equipment behavior.

Evidence to ask for
A point-check record showing the command, the instrument reading and the equipment response.

Field verification

Systems integration (MSI)

Verify interfaces, point mapping and information flow.

Evidence to ask for
A field-to-screen check that pairs the source point with its displayed value.

Field verification

Energy

Check meter inputs and the operating conditions behind the baseline.

Evidence to ask for
A meter check with units, timestamp and the operating load at the time.

Field verification

Industrial automation

Trace the start output to the starter, then check motor feedback and the separate flow switch.

Evidence to ask for
A record showing the start command, motor feedback and flow proof as three separate observations.

Field verification

QA/QC

Check the installed switch, wiring and label against the approved documents. Record corrections by equipment tag.

Evidence to ask for
An inspection record with the equipment tag, correction and field recheck.
03 · Trusted data

Trusted data

Commissioning (Cx)

Trace verification results to requirements and field conditions.

Evidence to ask for
A test record linking the field observation to the requirement it demonstrated.

Trusted data

Building controls

Confirm readings, commands, feedback and operating modes.

Evidence to ask for
A time-aligned trend of the request, feedback and operating mode.

Trusted data

Systems integration (MSI)

Validate identity, units, scaling, timestamps and data context.

Evidence to ask for
A checked point record with source, units, scaling and timestamp.

Trusted data

Energy

Use validated trends and meter data to assess performance.

Evidence to ask for
A trend with its meter source, time interval and relevant operating load.

Trusted data

Industrial automation

Match the HMI indications to the PLC inputs. Check how the display identifies a missing or stale signal.

Evidence to ask for
A comparison of field feedback and the operator display, including how missing feedback appears.

Trusted data

QA/QC

Match drawings, inspection records and photos to the installed equipment. Verify the evidence for each correction.

Evidence to ask for
A field record linking the drawing revision, installation photo and verified correction.
04 · Operational readiness

Operational readiness

Commissioning (Cx)

Close verification records and identify remaining restrictions.

Evidence to ask for
A handoff record listing passed tests, outstanding restrictions and the person taking each action.

Operational readiness

Building controls

Prepare sequences, alarms and system information for operators.

Evidence to ask for
Operator reference notes showing the sequence, alarm meaning and source of feedback.

Operational readiness

Systems integration (MSI)

Deliver usable system relationships, point records and platform information.

Evidence to ask for
An interface handoff naming the source system, mapped points and support contact.

Operational readiness

Energy

Agree review routines, operating expectations and performance measures.

Evidence to ask for
A performance review schedule with meter coverage and responsibility for following up.

Operational readiness

Industrial automation

Walk operators through a start, loss of proof and recovery using the agreed sequence and alarm history.

Evidence to ask for
An operator walkthrough record showing the alarm, the status after recovery and the evidence reviewed.

Operational readiness

QA/QC

Bring completed checks and named owners for open items to the readiness review. Flag what could limit the test.

Evidence to ask for
A readiness list separating completed field checks from open items, with a responsible party for each.
05 · Continuing performance

Continuing performance

Commissioning (Cx)

Follow performance through ongoing review and verification.

Evidence to ask for
A retest record linking the original finding to the newly witnessed response.

Continuing performance

Building controls

Investigate behavior and implement approved control improvements.

Evidence to ask for
A change record with the approved sequence and before-and-after trend.

Continuing performance

Systems integration (MSI)

Keep information usable as systems and vendors change.

Evidence to ask for
An updated point map and a field-to-screen check after a system change.

Continuing performance

Energy

Investigate use, prioritize improvements and verify results.

Evidence to ask for
A before-and-after comparison documenting load, schedule and the meter data used.

Continuing performance

Industrial automation

Compare the operator’s alarm history and signal trends when an intermittent trip returns.

Evidence to ask for
An event timeline comparing the command, motor response and flow feedback during the trip.

Continuing performance

QA/QC

Recheck affected installations after changes. Keep the correction and retest linked to the original field record.

Evidence to ask for
A correction record linking the original issue, affected equipment and retest result.

Engage one service or a coordinated team. We connect the interfaces, responsibilities and results around your project.

See how systems integration works
Follow a signal from the building controls to the operator’s screen.

MSI WITHIN THE SLA360 APPROACH

Master systems
integration (MSI).

Connect your systems.
Make the information useful.

We define how systems and vendors exchange information, verify what it means, and connect it to the records and operating decisions your facilities team needs.

Select a source. Follow the information and the checks it needs.

MSICoordinate the interface.
Verify the information.
Identity · Units · Mapping
Time · Quality · Authority
Explore point context →

OWNER’S OPERATING VIEW

Building controls / BAS & DDC

A measured temperature, a setpoint and a command have different purposes. Keep the equipment, space and point function identifiable.

Verify at the interface
Point identity, units, actual versus commanded status, timestamps and quality flags.
Use it to
Investigate a comfort complaint and compare the equipment response with its approved sequence.
Explore controls delivery →

Compare the measured room temperature with its setpoint, then check how the equipment responds.

Source informationMSI coordination & verificationOwner’s operating view

Illustrative information paths. Local systems retain their control and protective functions. Hover or focus to hold a route; select a source to keep it visible.

Markets we serve

Choose your facility type to see how we help your team test equipment, connect controls and keep systems running.

01

Campuses & research

One building. A much larger system.

02

Healthcare & life sciences

Conditions that support the work inside.

03

Data centers

Readiness. Response. Recovery.

04

Semiconductors

The process depends on what supports it.

05

Central plants & utilities

How chillers, pumps and storage work together.

06

Manufacturing & process

Connect the sequence to the production floor.

SLA team · Controls fieldwork.
07

Mining & heavy industry

Field conditions. Clear operating response.

08

Water & wastewater

From the field measurement to the response.

09

Airports & transportation

Keep the project connected to the operation.

10

Civic & public safety

Systems behind essential public services.

11

Federal & military

Owner requirements. Traceable verification.

12

Commercial & workplaces

Make the building work for its occupants.

13

Residential & mixed use

Shared systems. Everyday comfort.

14

Hospitality, sports & culture

Comfort, lighting and ventilation for a full house.

15

Logistics & distribution

Every equipment handoff matters.

WORK & EVIDENCE

Projects you can
ask us about.

At a campus handoff, on a production line or across a portfolio, the work looks different. Here’s what SLA and its partners have done.

Explore the project directory →

WHERE WE WORK

LOCAL TO ARIZONA.TRUSTED NATIONALLY.

Based in Tempe, Arizona. Available for projects across the U.S. and internationally.

Nationwide service

Nationwide reach from Tempe, Arizona, including all 50 states and Washington, DC Arizona is the only home base. Direct illustrative connections lead from Tempe to 35 selected geographic points, including California, Hawaii, Alaska, Texas, Colorado, Seattle, Michigan, New York City, Buffalo, Boston, New Jersey, Washington, DC and Florida. All 50 states and DC remain visible. Connections and markers show geographic reach, not offices, completed assignments or travel routes. Northern California, approximate geographic reference, not an office or project address Southern California, approximate geographic reference, not an office or project address San Diego, California, approximate geographic reference, not an office or project address Nevada, approximate geographic reference, not an office or project address Seattle, Washington, approximate geographic reference, not an office or project address Oregon, approximate geographic reference, not an office or project address Idaho, approximate geographic reference, not an office or project address Montana, approximate geographic reference, not an office or project address Colorado, approximate geographic reference, not an office or project address Utah, approximate geographic reference, not an office or project address New Mexico, approximate geographic reference, not an office or project address Wyoming, approximate geographic reference, not an office or project address Kansas, approximate geographic reference, not an office or project address Nebraska, approximate geographic reference, not an office or project address North Texas, approximate geographic reference, not an office or project address Houston, Texas, approximate geographic reference, not an office or project address Central Texas, approximate geographic reference, not an office or project address Oklahoma, approximate geographic reference, not an office or project address Louisiana, approximate geographic reference, not an office or project address Minnesota, approximate geographic reference, not an office or project address Illinois, approximate geographic reference, not an office or project address Michigan, approximate geographic reference, not an office or project address Missouri, approximate geographic reference, not an office or project address Buffalo, upstate New York, approximate geographic reference, not an office or project address New York City, approximate geographic reference, not an office or project address New Jersey, approximate geographic reference, not an office or project address Boston, Massachusetts, approximate geographic reference, not an office or project address Washington, DC, approximate geographic reference, not an office or project address Georgia, approximate geographic reference, not an office or project address North Carolina, approximate geographic reference, not an office or project address Tennessee, approximate geographic reference, not an office or project address Central Florida, approximate geographic reference, not an office or project address South Florida, approximate geographic reference, not an office or project address Alaska, approximate geographic reference, not an office or project address Hawaii, approximate geographic reference, not an office or project address

Selected locations from Mike and Marcus’s career experience.

North America
Canada · Mexico
Europe
United Kingdom, including Scotland · Ireland · France · Germany · Austria · Italy · Russia
Asia & Pacific
China · Japan · South Korea · Taiwan · Singapore · Malaysia · Australia
Middle East & Africa
Israel · Africa
Tempe, Arizona

Our home base.

National delivery

Site presence and technical support.

International support

Planned around the assignment.

Four SLA team members in hard hats and high-visibility vests at electrical equipment.
SLA field team at electrical equipment.

TRAVEL & REMOTE SITE DELIVERY

The right team.
Ready for the assignment.

Where your project takes us, we plan field presence, technical support and clear handoffs around the work and its milestones.

Plan the mobilization.

Coordinate qualifications, site access, training, tools, work windows and travel before the team arrives.

Match the people to the work.

Bring the right field skills and technical support. Plan Mike’s and Marcus’s involvement around critical decisions.

Keep the work connected.

Carry current drawings, configurations, backups and open actions through each shift and team handoff.

Staffing, travel, rotations and site coverage are agreed for each assignment.

Streamline Automation · Tempe, Arizona

3025 S. 48th St., Suite 103 · Tempe, AZ 85282

Open office map & directions ↗Call 602-438-6061

SLA RESOURCES

Explore our services
and experience.

Review our qualifications, see examples of the work and explore the technical detail relevant to your project.

CONTACT STREAMLINE AUTOMATION

We’d like to
hear from you.

Tell Mike and Marcus what you’re building, what’s holding up the work or what your operators need from the next handoff. A few lines are enough.

Tell us about your project.

Use this form to draft one email to Mike and Marcus.

Choose an email app after preparing your draft. You’ll review it and press Send there.

LET’S CONNECT

Talk with our team.

Reach out to Mike or Marcus directly, or use the form to start an email to both of us.

Call our office602-438-6061

Based in Tempe, Arizona.

FROM A CONVERSATION TO A PARTNERSHIP

How we get started.

We listen.

You share your plans, priorities and what matters to your team.

We explore.

Together, we consider where our experience and services can support your goals.

We agree.

If we’re a good fit, we define the approach, responsibilities and next step together.

Questions about working with SLA? →

SEE WHAT SLA CAN DO.

Enlarged technical illustration

Illustrative only. No live system connection.